Planning Report - 13 Eumundi-Noosa Road, Noosaville QLD 4566 - Dual Occupany
Performance outcomes Acceptable outcomes Response
Manual, Queensland Urban Drainage Manual and
the Australian Rainfall and Runoff Guide), all lots
have access to the flood free area identified
in Table 8.2.6.5 that matches the road immunity.
PO5 AO5 Complies with AO5
For reconfiguring a lot or operational works, In the Flood Hazard Overlay, or in areas otherwise
The proposed development will ensure that no
development does not directly, indirectly or determined to be subject to the DFE or DSTE,
loss in flood storage capacity will occur and aby
cumulatively alter the flood characteristics development ensures:
changes in floodwaters can be contained within
external to the development site for all flooding
the site at 2100.
and inundation events up to and including
1. there is no loss of on-site flood
the DFE or DSTE based on:
storage capacity;
1. current climate conditions; and
2. all changes to level, depth, duration
2. incorporating an appropriate and velocity of floodwaters are
allowance for the predicted impacts contained within the site for all flood
of climate change. events up to and including
the DFE based on current climate
and predicted impacts of climate
change at 2100;
3. there is no acceleration or
retardation of flows, or any
retardation in flood warning times,
elsewhere on the floodplain and to
any overland flow paths; and
4. there is no increased stormwater
ponding on sites upstream,
downstream or in the general vicinity
of the site.
Development Application: 13 Eumundi Noosa Road, Noosaville Noosa Plan 2020: Amendment 1 Effective date: 25/09/2020