Planning Report - 13 Eumundi-Noosa Road, Noosaville QLD 4566 - Dual Occupany
Performance outcomes Acceptable outcomes Response
flood damage on the premises or
other premises;
2. natural landforms and drainage lines
are maintained to protect the
hydraulic performance of waterways
and flood plain; and
3. development integrates with the
natural landform rather than
modifying the landform to suit the
development as far as practicable.
PO4 AO4.1 Complies with AO4.1
For reconfiguring a lot, development does not Development provides an effective evacuation
The proposed development provides an effective
compromise the safety of people resulting from route that remains passable, with sufficient flood
evacuation route that remains passable to enable
the flood risk associated with events exceeding warning time, to enable people to progressively
residents to evacuate to safe areas.
the DFE. evacuate to safe areas above the PMF in the face
of advancing flood or waters for events that
exceed the DFE.
OR
AO4.2
Development provides for an area of sufficient size
and dimensions on site above the PMF that allows
for safe congregation and refuge.
AO4.3 Not applicable
Where the existing roads servicing a development
The proposed development is for residential uses.
provide a specific flood immunity (as determined
by the Qld Transport Road and Drainage Design
Development Application: 13 Eumundi Noosa Road, Noosaville Noosa Plan 2020: Amendment 1 Effective date: 25/09/2020
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.