Original source · versioned page text
Planning Report - 13 Eumundi-Noosa Road, Noosaville QLD 4566 - Dual Occupany
Performance outcomes Acceptable outcomes Response
3. shorten flood warning times for
other uses in the floodplain; or
4. impact on the ability of traffic to use
evacuation routes, or unreasonably
increase traffic volumes on
evacuation routes.
AO7.3 Not applicable
Materials stored on site:
The proposed development is for residential uses
and therefore will not be storing materials on site.
1. are readily able to be moved in a
flood event to a flood free area; or
2. are contained in order to minimise
movement in times of flood.
Editor's Note— Businesses should ensure that
necessary emergency and continuity plans are in
place to account for the potential need to evacuate
personnel and to relocate property prior to a flood
event.
Essential network infrastructure
PO8 AO8 Complies with AO8
Essential network infrastructure maintains Essential network infrastructure that is likely to fail
Components of the essential network
effective function during and immediately after to function or may result in contamination when
infrastructure comply with any relevant
flood and storm tide inundation events. inundated by flood water (e.g. water supply
regulations and specifications.
pipeline air valves and the like) is located above
the DFE level (or where the DFE has not been
Development Application: 13 Eumundi Noosa Road, Noosaville Noosa Plan 2020: Amendment 1 Effective date: 25/09/2020
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.