Original source · versioned page text
Planning Report - 13 Eumundi-Noosa Road, Noosaville QLD 4566 - Dual Occupany
Performance outcomes Acceptable outcomes Response
modelled for the area, above the highest recorded
flood level for the area).
Essential community infrastructure
PO9 AO9.1 Not applicable
Essential community infrastructure is able to Essential community infrastructure is sited and
The proposed development is for residential uses.
function effectively during and immediately after constructed to ensure that flood levels comply
flood events. with flood immunity requirements specified
in Table 8.2.6.4.
AO9.2 Not applicable
Essential community infrastructure which is
The proposed development is for residential uses.
located below the specified flood immunity
requirements:
1. is designed and constructed to
function effectively during and
immediately after the recommended
flood level event; and
2. has direct access to low hazard
evacuation routes or an emergency
rescue area above the PMF, if it is
for emergency services (including
emergency shelters, police facilities,
hospitals and associated facilities).
Earthworks
Development Application: 13 Eumundi Noosa Road, Noosaville Noosa Plan 2020: Amendment 1 Effective date: 25/09/2020
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.