Original source · versioned page text
Planning statement
Landslide Hazard Area
PO22
Development maintains the safety of people, property and hazardous materials stored
in bulk from the risk of landslide.
The associated Acceptable Outcomes identify that the development, including access,
are not located within the land identified on landslide areas on a Landslide Hazard
Overlay Map.
In this instance, the proposed development is the change of use of an existing building,
with an existing access, to a Dwelling House. The site of the dwelling house is outside
of the landslide hazard area; however, the access is provided through the landslide
hazard area. The access is an existing access and no additional works are required to
facilitate access. The proposed development would not increase the risk of landslide on
the site.
www.gmacert.com.au
BUILDING APPROVALS & INSPECTIONS BUILDING CERTIFICATION FIRE SAFETY AUDITS Page 12 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.