Skip to the record
Accept no imitations.

Original source · versioned page text

11. Appendix H - Traffic Impact Assessment

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 17, section 1. The text section number identifies this passage in the reader.

20 Hofmann Drive, Noosaville | Traffic Impact Assessment


7.0 Bicycle Parking
7.1 Overview
The development includes end of trip facilities and current provisions include 22 bicycle parking spaces.
The proposed bicycle spaces are to be located adjacent to the T22 tenancy.


7.2 Review
The recommended bicycle parking provisions have been calculated based on the rates identified in
Austroads Guide to Traffic Engineering Practice, Part 14 – Bicycles (Austroads Cycling Guide) and a
summary of the recommended provision is provided in Table 7.3.

Table 7.3 Bicycle Parking Review – Austroads Cycling Guide
                                                                       Austroads Rate                          Number Bicycle Spaces
        Land Use                          Yield
                                                                    Staff                Visitor             Staff      Visitor      Total
      Drive In
                                       12,540m2                  1 / 300m2             1 / 500m2              42          25          67
  Shopping Centre
       Total                           12,540m2                        -                      -               42          25          67


We understand that the end of trip facilities will be located in at ground level within the T22 tenancy as
identified in drawing A-DA-0100 which has been prepared by The Buchan Group. A copy of this drawing
is included in Appendix A.

Austroads notes that it can be appropriate to provide 50% of the recommended provisions at the initial
development stage and provide additional bicycle parking as demand is realised. There is sufficient
space on site to provide bicycle parking as required to meet the provisions outlined above.


7.3 Summary
The proposed bicycle parking and end of trip facilities are expected to comply with the requirements of
The Noosa Plan Division 3 Business Uses Code. The proposed provisions are considered to be acceptable
from a transport engineering perspective.




\\FILE\Projects\BLU0517\01\3. Deliverables\1. Reports\2.TIA 2019\TIA_20 Hofmann Drive, Noosaville.docx   Cambray Consulting Pty Ltd | Page 17
Log in to download the original file

11. Appendix H - Traffic Impact Assessment.pdf · 6.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.