Original source · versioned page text
11. Appendix H - Traffic Impact Assessment
Original PDF page 36, section 1. The text section number identifies this passage in the reader.
ONE WAY SERVICE AISLE
TRANSFORMER PUMP HOUSE SPRINKLERS
WATER TANK
3 2 2
A-DA-1200 A-DA-1203 A-DA-1205
SITE BOUNDARY
RL 9.0
RL 8.5 PH
ST
20 S
TAFF
PAR
KING
RL 8.7 SPA
CES
RL 9.5
RL 8.0
RL 8.8
CUS
TOM
ER C
ARP
ARK
ING
RL 8.8
RL 8.2
12.5 RL 8.8
CONCEPT DRAWING.
RY/ EXIT &
2.4 5.9 1.4
FOR DISCUSSION ONLY .
HRV - Heavy Rigid Vehicle
Overall Length 12.500m
Overall Width 2.500m 0 5 10 15 20 25m
Overall Body Height 4.300m
Min Body Ground Clearance 0.417m
Track Width
Lock to Lock Time
2.500m
6.00s
1:500 @A3 (Approx.)
Kerb to Kerb Turning Radius 12.500m Approx.
RY
NDA
A Report PRELIMINARY BLU0517-01
BOU
16.05.19 MG AD
Proposed Retail Business (Type 4) Showroom NOT FOR CONSTRUCTION
CAMBRAYconsulting 20 Hofmann Drive SK06
SITE
Traffic Engineering and Transport Planning 12.5m Heavy Rigid Vehicle (12.5m HRV) Swept Path
Noosaville, QLD
This concept takes into account the instructions and requirements of our client. Cambray has taken care
Suite 2601, 21 Mary Street Brisbane Q 4000 in preparing this concept, however it neither accepts liability nor responsibility whatsoever in respect 16.05.2019 1:500 Blueprint Group Australia Pty Ltd
t : 07 3221 3503 | e : [email protected] of; any use of this document by any third party, any third party whose interests may be affected by any
decision made regarding the contents of this document and/or any conclusion drawn resulting from
omission or lack of full discloser by the client or the client's consultants.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.