11. Appendix H - Traffic Impact Assessment
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
20 Hofmann Drive, Noosaville | Traffic Impact Assessment 4.0 Development Access 4.1 Overview Vehicular access to the Proposed Development is proposed to be consistent with the Previous Approval. The proposed access arrangements are outlined below: Access 1 – All-movements access via the western leg of the Hofmann Drive / Noosa Shire Business Centre Access roundabout; Access 2 – All-movements access via Hofmann Drive; and Access 3 – Entry access for trucks / service vehicles only via Eenie Creek Road Service Road. 4.2 Access 1 – Hofmann Drive / Noosa Business Centre Access / Development Access There is an existing stub road on the western side of the Hofmann Drive roundabout. The proposed development access is to match into the existing alignment of this road stub, consistent with the Previous Approval. This access is to be all-movements and cater for cars entry/egress and service vehicle egress. 4.3 Access 2 – Hofmann Drive / Proposed Development Access Access 2 is proposed to be configured as per the Previous Approval. Currently, there is a break in the median and a short channelised right turn treatment was formed up on the southbound approach. The driveway is proposed to be constructed generally in accordance with The Noosa Plan, Division 13 – Driveways and Carparking Code (Driveways and Carparking Code), which requires that driveways comply with relevant Australian Standards (i.e. AS2890.1 and AS2890.2). Swept paths analyses was undertaken to understand if the currently proposed access configuration is adequate to accommodate the design vehicles associated with the Proposed Development. The analyses indicated that the access can appropriately accommodate the adopted design vehicles and a copy of the swept path analyses is included in Appendix D. 4.4 Access 3 – Eenie Creek Road Service Road / Service Vehicle Access Access 3 is proposed to be a truck / service vehicle access only. Vehicles are to enter the service area from the end of the Eenie Creek Road Service Road cul-de-sac. There is an existing driveway stub extending from the cul-de-sac to the boundary of the development site and Access 3 is proposed to match into this existing section of driveway, consistent with the Previous Approval. Swept paths analyses was undertaken to understand if the currently proposed access configuration is adequate to accommodate design vehicles. The analyses indicated that the access can appropriately accommodate the adopted design vehicles and a copy of the swept path analyses is included in Appendix D. \\FILE\Projects\BLU0517\01\3. Deliverables\1. Reports\2.TIA 2019\TIA_20 Hofmann Drive, Noosaville.docx Cambray Consulting Pty Ltd | Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.