Our reference:     SDA-0214-008136
Applicant reference: 52312
Council reference: MCU14/0009



Date:        27/02/2014


Keith & Christina Rolton
C/- Murray & Associates
PO Box 246
Nambour, Qld, 4560


Dear Blake Bell

Information request—concurrence agency
1 Factory Street - Pomona, Noosa Shire Council - QLD4568
(Given under section 276 of the Sustainable Planning Act 2009)

The referral agency material for the development application was received by the
Department of State Development, Infrastructure and Planning under section 272 of
the Sustainable Planning Act 2009 on 14 February 2014.

The department has carried out an initial review of the application and has
determined that in accordance with section 276 of the Sustainable Planning Act
2009, the following additional information is requested to complete the assessment of
the application:




    Page 1
                                                                 SEQ North Region
                                                                 Level 8, Mike Ahern Building
                                                                 12 First Avenue
                                                                 PO Box 1127 Maroochydore QLD 4558
Full text of the other 4 pages

Page 2

Item    Information requested
Development Permit for Material Change of Use
  1.    The applicant is requested to amend the Site Plan to provide a more detailed
        analysis of vehicle turning movements. The applicant is to ensure the following
        information is included in the site plan:
              #       Provide clear delineation of the allowed movements throughout the
                      site and at the entry / exit through signage and / or line marking and
                      narrowing of the access points. Note: extending the central garden will
                      assist in clarifying the access arrangements on the site.
              #       Vehicle swept paths for all vehicle types utilizing the site. This is to
                      demonstrate that within the subject site there is sufficient provision for
                      on-site vehicular maneuvering space to safely enter and exit the site
                      regardless of any vehicles queuing at the petrol bowsers.
  2.    The applicant is to demonstrate that visibility at the proposed / existing access point
        achieves the Safe Intersection Sight Distance in the Department of Transport and
        Main Roads’ Road Planning and Design Manual (RPDM) and relevant sections of
        the AUSTROADS Guide to Road Design, Part4A – Unsignalised and Signalised
        Intersection for a 70km/h design speed (to suit the posted speed of 60km/h).

              This must be demonstrated based on a physical survey and detailed on the plans
              certified by an appropriate Registered Professional Engineer Queensland (RPEQ) or
              Registered Surveyor.
   3.         The applicant is requested to provide a Stormwater Management and Design (water
              quantity and quality) report that demonstrates that the proposed development
              addresses potential stormwater impacts on the state-controlled road network. In
              particular, the applicant is to demonstrate that the proposed installation of water
              tanks will mitigate any increase to drainage on Kin Kin Road and will mitigate any
              increase in the width of flow in the kerb or encroach onto the road.

              The Stormwater Management Design must:
                   a)      Be certified by a Registered Professional Engineer Queensland
                           (RPEQ)
                   b)      Be prepared in accordance with the department’s Road Drainage
                           Manual which can be accessed at
                   http://www.tmr.qld.gov.au/Business-industry/Technical-standards-publications/
                   Road-drainage-manual.aspx and with consideration given to the Queensland
                   urban Drainage Manual available at http://www.derm.qld.gov.au/water/
                   regulation/drainagemanual.html http://www.ehp.qld.gov.au/water/policy/
                   urban_stormwater_planning_guidelines.html and the Environmental Protection
                   Act 1994 and Environmental Protection (Water) Policy 2009 which are
                   available at www.legislation.qld.gov.au
                   c)      Demonstrate that the management of stormwater (quantity and quality)
                           post development can achieve a no worsening impact (on the pre-
                           development condition) in accordance with the design criteria in the
                           department’s Road Drainage Manual. Stormwater management for
                           the proposed development must ensure no worsening or actionable
                           nuisance to the state-controlled road network caused by peak
                           discharges, flood levels, frequency / duration of flooding, flow velocity,
                           water quality, sedimentation and scour effects.
                   d)      Ensure the following are addressed, where applicable:




Department of State Development, Infrastructure and Planning                   Page .   2

Page 3

                                   #      All relevant legal points of discharge for the development site
                                          are identified. No new discharge points for stormwater will be
                                          permitted on state controlled roads;
                                   #      Overland flow paths are identified and hydraulic conveyance is
                                          maintained on the site as part of the proposed development;
                                   #      Flood storage capacity is maintained on the site as part of the
                                          proposed development;
                                   #      The adverse impacts from sheet flow on the state-controlled
                                          road network are prevented;
                                   #      Existing stormwater drainage infrastructure on state-controlled
                                          road is not interfered with or damaged such as through
                                          concentrated flows, surcharging, scour or depositions; and
                                   #      The quality of stormwater discharging onto the state-controlled
                                          road is not reduced through erosion and sedimentation.
                       e)          Include details of the mitigation measures proposed to address any
                                   potential stormwater impacts (including flooding impacts) of the
                                   proposed development.


Under section 278 of the Sustainable Planning Act 2009, when responding to this
request you must advise whether you are supplying all of the information requested,
part of the information requested, or none of the information requested. If you
are supplying part or none of the information requested, you are also required to
provide written notice asking the department to proceed with the assessment of the
application.

The due date for receipt of this information is 6 months after the day you receive this
request. If necessary you may request an extension to this period. Unless a response
to this request for further information has been received from you within this period or
any extension during this period, your application will lapse.

A pro forma is attached to this notice to assist you in providing an information request
response which complies with the requirements of the Sustainable Planning Act
2009.

Please be advised that the application will be assessed on the basis of the
information provided. It is therefore recommended that you respond to all of the
information requested by the department. Further details regarding the information
request response period and the lapsing of development applications are set out in
sections 279 and 280 of the Sustainable Planning Act 2009.




 Department of State Development, Infrastructure and Planning                       Page .   3

Page 4

Your response to the information request must be submitted to the department
through MyDAS or alternatively emailed to [email protected] the department is a concurrence agency, you must also give a copy of the
information request response to the assessment manager under section 278(2) of
the Sustainable Planning Act 2009.


If you require any further information, please contact Tracey Smith, A/ Senior
Planning Officer, on 3882 8409 KEYWORDS "[insert contact details]" \*
MERGEFORMAT , or via email [email protected], who will be
pleased to assist.

Yours sincerely




Garth Nolan
Manager, Planning

cc: Noosa Shire Council




 Department of State Development, Infrastructure and Planning           Page .   4

Page 5

Our reference: 52312
Your reference: SDA-0214-008136

Attn:       [email protected]


Response to information request—concurrence agency
(Given under section 278 of the Sustainable Planning Act 2009)

  Street address:                                      1 Factory Street - Pomona, QLD, 4568

  Real property description:                           20 SP194118

  Assessment manager                                   MCU14/0009
  reference:
  Local government area:                               Noosa Shire Council


As the applicant of the above development application, I am responding to your
information request by:

            Enclosing all of the information requested.
            Enclosing part of the information requested and asking that the requesting
            authority proceed with the assessment of the application.
            Advising that I do not intend to supply any of the information requested and
            asking that the requesting authority proceed with the assessment of the
            application.


  Name of applicant:                       Keith & Christina Rolton
  Signature of
  applicant:
  Date:




  Department of State Development, Infrastructure and Planning                           Page .   5

Used in these records

About this file

File size
46 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Information request 8136pdf[1].pdf · 46 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.