Information request 8136pdf[1] · MCU14/0009
Attached to the e-mail MCU14/0009 Information Request Concurrence Agency 1 Factory Street Pomona.
Our reference: SDA-0214-008136 Applicant reference: 52312 Council reference: MCU14/0009 Date: 27/02/2014 Keith & Christina Rolton C/- Murray & Associates PO Box 246 Nambour, Qld, 4560 Dear Blake Bell Information request—concurrence agency 1 Factory Street - Pomona, Noosa Shire Council - QLD4568 (Given under section 276 of the Sustainable Planning Act 2009) The referral agency material for the development application was received by the Department of State Development, Infrastructure and Planning under section 272 of the Sustainable Planning Act 2009 on 14 February 2014. The department has carried out an initial review of the application and has determined that in accordance with section 276 of the Sustainable Planning Act 2009, the following additional information is requested to complete the assessment of the application: Page 1 SEQ North Region Level 8, Mike Ahern Building 12 First Avenue PO Box 1127 Maroochydore QLD 4558
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
Item Information requested
Development Permit for Material Change of Use
1. The applicant is requested to amend the Site Plan to provide a more detailed
analysis of vehicle turning movements. The applicant is to ensure the following
information is included in the site plan:
# Provide clear delineation of the allowed movements throughout the
site and at the entry / exit through signage and / or line marking and
narrowing of the access points. Note: extending the central garden will
assist in clarifying the access arrangements on the site.
# Vehicle swept paths for all vehicle types utilizing the site. This is to
demonstrate that within the subject site there is sufficient provision for
on-site vehicular maneuvering space to safely enter and exit the site
regardless of any vehicles queuing at the petrol bowsers.
2. The applicant is to demonstrate that visibility at the proposed / existing access point
achieves the Safe Intersection Sight Distance in the Department of Transport and
Main Roads’ Road Planning and Design Manual (RPDM) and relevant sections of
the AUSTROADS Guide to Road Design, Part4A – Unsignalised and Signalised
Intersection for a 70km/h design speed (to suit the posted speed of 60km/h).
This must be demonstrated based on a physical survey and detailed on the plans
certified by an appropriate Registered Professional Engineer Queensland (RPEQ) or
Registered Surveyor.
3. The applicant is requested to provide a Stormwater Management and Design (water
quantity and quality) report that demonstrates that the proposed development
addresses potential stormwater impacts on the state-controlled road network. In
particular, the applicant is to demonstrate that the proposed installation of water
tanks will mitigate any increase to drainage on Kin Kin Road and will mitigate any
increase in the width of flow in the kerb or encroach onto the road.
The Stormwater Management Design must:
a) Be certified by a Registered Professional Engineer Queensland
(RPEQ)
b) Be prepared in accordance with the department’s Road Drainage
Manual which can be accessed at
http://www.tmr.qld.gov.au/Business-industry/Technical-standards-publications/
Road-drainage-manual.aspx and with consideration given to the Queensland
urban Drainage Manual available at http://www.derm.qld.gov.au/water/
regulation/drainagemanual.html http://www.ehp.qld.gov.au/water/policy/
urban_stormwater_planning_guidelines.html and the Environmental Protection
Act 1994 and Environmental Protection (Water) Policy 2009 which are
available at www.legislation.qld.gov.au
c) Demonstrate that the management of stormwater (quantity and quality)
post development can achieve a no worsening impact (on the pre-
development condition) in accordance with the design criteria in the
department’s Road Drainage Manual. Stormwater management for
the proposed development must ensure no worsening or actionable
nuisance to the state-controlled road network caused by peak
discharges, flood levels, frequency / duration of flooding, flow velocity,
water quality, sedimentation and scour effects.
d) Ensure the following are addressed, where applicable:
Department of State Development, Infrastructure and Planning Page . 2
Page 3
# All relevant legal points of discharge for the development site
are identified. No new discharge points for stormwater will be
permitted on state controlled roads;
# Overland flow paths are identified and hydraulic conveyance is
maintained on the site as part of the proposed development;
# Flood storage capacity is maintained on the site as part of the
proposed development;
# The adverse impacts from sheet flow on the state-controlled
road network are prevented;
# Existing stormwater drainage infrastructure on state-controlled
road is not interfered with or damaged such as through
concentrated flows, surcharging, scour or depositions; and
# The quality of stormwater discharging onto the state-controlled
road is not reduced through erosion and sedimentation.
e) Include details of the mitigation measures proposed to address any
potential stormwater impacts (including flooding impacts) of the
proposed development.
Under section 278 of the Sustainable Planning Act 2009, when responding to this
request you must advise whether you are supplying all of the information requested,
part of the information requested, or none of the information requested. If you
are supplying part or none of the information requested, you are also required to
provide written notice asking the department to proceed with the assessment of the
application.
The due date for receipt of this information is 6 months after the day you receive this
request. If necessary you may request an extension to this period. Unless a response
to this request for further information has been received from you within this period or
any extension during this period, your application will lapse.
A pro forma is attached to this notice to assist you in providing an information request
response which complies with the requirements of the Sustainable Planning Act
2009.
Please be advised that the application will be assessed on the basis of the
information provided. It is therefore recommended that you respond to all of the
information requested by the department. Further details regarding the information
request response period and the lapsing of development applications are set out in
sections 279 and 280 of the Sustainable Planning Act 2009.
Department of State Development, Infrastructure and Planning Page . 3
Page 4
Your response to the information request must be submitted to the department through MyDAS or alternatively emailed to [email protected] the department is a concurrence agency, you must also give a copy of the information request response to the assessment manager under section 278(2) of the Sustainable Planning Act 2009. If you require any further information, please contact Tracey Smith, A/ Senior Planning Officer, on 3882 8409 KEYWORDS "[insert contact details]" \* MERGEFORMAT , or via email [email protected], who will be pleased to assist. Yours sincerely Garth Nolan Manager, Planning cc: Noosa Shire Council Department of State Development, Infrastructure and Planning Page . 4
Page 5
Our reference: 52312
Your reference: SDA-0214-008136
Attn: [email protected]
Response to information request—concurrence agency
(Given under section 278 of the Sustainable Planning Act 2009)
Street address: 1 Factory Street - Pomona, QLD, 4568
Real property description: 20 SP194118
Assessment manager MCU14/0009
reference:
Local government area: Noosa Shire Council
As the applicant of the above development application, I am responding to your
information request by:
Enclosing all of the information requested.
Enclosing part of the information requested and asking that the requesting
authority proceed with the assessment of the application.
Advising that I do not intend to supply any of the information requested and
asking that the requesting authority proceed with the assessment of the
application.
Name of applicant: Keith & Christina Rolton
Signature of
applicant:
Date:
Department of State Development, Infrastructure and Planning Page . 5
Used in these records
Information request 8136pdf[1].pdfRelated documentApplication case desk ↗
About this file
- File size
- 46 KB (small file)
- File type
No other editions are linked here.