Information request 8136pdf[1] · MCU14/0009
Attached to the e-mail MCU14/0009 Information Request Concurrence Agency 1 Factory Street Pomona.
Item Information requested
Development Permit for Material Change of Use
1. The applicant is requested to amend the Site Plan to provide a more detailed
analysis of vehicle turning movements. The applicant is to ensure the following
information is included in the site plan:
# Provide clear delineation of the allowed movements throughout the
site and at the entry / exit through signage and / or line marking and
narrowing of the access points. Note: extending the central garden will
assist in clarifying the access arrangements on the site.
# Vehicle swept paths for all vehicle types utilizing the site. This is to
demonstrate that within the subject site there is sufficient provision for
on-site vehicular maneuvering space to safely enter and exit the site
regardless of any vehicles queuing at the petrol bowsers.
2. The applicant is to demonstrate that visibility at the proposed / existing access point
achieves the Safe Intersection Sight Distance in the Department of Transport and
Main Roads’ Road Planning and Design Manual (RPDM) and relevant sections of
the AUSTROADS Guide to Road Design, Part4A – Unsignalised and Signalised
Intersection for a 70km/h design speed (to suit the posted speed of 60km/h).
This must be demonstrated based on a physical survey and detailed on the plans
certified by an appropriate Registered Professional Engineer Queensland (RPEQ) or
Registered Surveyor.
3. The applicant is requested to provide a Stormwater Management and Design (water
quantity and quality) report that demonstrates that the proposed development
addresses potential stormwater impacts on the state-controlled road network. In
particular, the applicant is to demonstrate that the proposed installation of water
tanks will mitigate any increase to drainage on Kin Kin Road and will mitigate any
increase in the width of flow in the kerb or encroach onto the road.
The Stormwater Management Design must:
a) Be certified by a Registered Professional Engineer Queensland
(RPEQ)
b) Be prepared in accordance with the department’s Road Drainage
Manual which can be accessed at
http://www.tmr.qld.gov.au/Business-industry/Technical-standards-publications/
Road-drainage-manual.aspx and with consideration given to the Queensland
urban Drainage Manual available at http://www.derm.qld.gov.au/water/
regulation/drainagemanual.html http://www.ehp.qld.gov.au/water/policy/
urban_stormwater_planning_guidelines.html and the Environmental Protection
Act 1994 and Environmental Protection (Water) Policy 2009 which are
available at www.legislation.qld.gov.au
c) Demonstrate that the management of stormwater (quantity and quality)
post development can achieve a no worsening impact (on the pre-
development condition) in accordance with the design criteria in the
department’s Road Drainage Manual. Stormwater management for
the proposed development must ensure no worsening or actionable
nuisance to the state-controlled road network caused by peak
discharges, flood levels, frequency / duration of flooding, flow velocity,
water quality, sedimentation and scour effects.
d) Ensure the following are addressed, where applicable:
Department of State Development, Infrastructure and Planning Page . 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information request 8136pdf[1].pdfRelated documentApplication case desk ↗
About this file
- File size
- 46 KB (small file)
- File type
No other editions are linked here.