Attached to the e-mail MCU14/0009 Information Request Concurrence Agency 1 Factory Street Pomona.
# All relevant legal points of discharge for the development site
are identified. No new discharge points for stormwater will be
permitted on state controlled roads;
# Overland flow paths are identified and hydraulic conveyance is
maintained on the site as part of the proposed development;
# Flood storage capacity is maintained on the site as part of the
proposed development;
# The adverse impacts from sheet flow on the state-controlled
road network are prevented;
# Existing stormwater drainage infrastructure on state-controlled
road is not interfered with or damaged such as through
concentrated flows, surcharging, scour or depositions; and
# The quality of stormwater discharging onto the state-controlled
road is not reduced through erosion and sedimentation.
e) Include details of the mitigation measures proposed to address any
potential stormwater impacts (including flooding impacts) of the
proposed development.
Under section 278 of the Sustainable Planning Act 2009, when responding to this
request you must advise whether you are supplying all of the information requested,
part of the information requested, or none of the information requested. If you
are supplying part or none of the information requested, you are also required to
provide written notice asking the department to proceed with the assessment of the
application.
The due date for receipt of this information is 6 months after the day you receive this
request. If necessary you may request an extension to this period. Unless a response
to this request for further information has been received from you within this period or
any extension during this period, your application will lapse.
A pro forma is attached to this notice to assist you in providing an information request
response which complies with the requirements of the Sustainable Planning Act
2009.
Please be advised that the application will be assessed on the basis of the
information provided. It is therefore recommended that you respond to all of the
information requested by the department. Further details regarding the information
request response period and the lapsing of development applications are set out in
sections 279 and 280 of the Sustainable Planning Act 2009.
Department of State Development, Infrastructure and Planning Page . 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information request 8136pdf[1].pdfRelated documentApplication case desk ↗
About this file
- File size
- 46 KB (small file)
- File type
No other editions are linked here.