Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Information request 8136pdf[1] · MCU14/0009

Attached to the e-mail MCU14/0009 Information Request Concurrence Agency 1 Factory Street Pomona.

of 5

Text shows just the words. Original shows the document exactly as it was published.

                                   #      All relevant legal points of discharge for the development site
                                          are identified. No new discharge points for stormwater will be
                                          permitted on state controlled roads;
                                   #      Overland flow paths are identified and hydraulic conveyance is
                                          maintained on the site as part of the proposed development;
                                   #      Flood storage capacity is maintained on the site as part of the
                                          proposed development;
                                   #      The adverse impacts from sheet flow on the state-controlled
                                          road network are prevented;
                                   #      Existing stormwater drainage infrastructure on state-controlled
                                          road is not interfered with or damaged such as through
                                          concentrated flows, surcharging, scour or depositions; and
                                   #      The quality of stormwater discharging onto the state-controlled
                                          road is not reduced through erosion and sedimentation.
                       e)          Include details of the mitigation measures proposed to address any
                                   potential stormwater impacts (including flooding impacts) of the
                                   proposed development.


Under section 278 of the Sustainable Planning Act 2009, when responding to this
request you must advise whether you are supplying all of the information requested,
part of the information requested, or none of the information requested. If you
are supplying part or none of the information requested, you are also required to
provide written notice asking the department to proceed with the assessment of the
application.

The due date for receipt of this information is 6 months after the day you receive this
request. If necessary you may request an extension to this period. Unless a response
to this request for further information has been received from you within this period or
any extension during this period, your application will lapse.

A pro forma is attached to this notice to assist you in providing an information request
response which complies with the requirements of the Sustainable Planning Act
2009.

Please be advised that the application will be assessed on the basis of the
information provided. It is therefore recommended that you respond to all of the
information requested by the department. Further details regarding the information
request response period and the lapsing of development applications are set out in
sections 279 and 280 of the Sustainable Planning Act 2009.




 Department of State Development, Infrastructure and Planning                       Page .   3

Used in these records

About this file

File size
46 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Information request 8136pdf[1].pdf · 46 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.