Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Part B - Attachments A to D

Attached to the e-mail Other Change Application – 132002.220285.5.

of 131

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Erosion and Sediment Control Code
Table 14-53 – Erosion and sediment control
 Specific Outcome                                 Probable Solution                                                     Response
 14.125 Effects of works
 Erosion and drainage control, sediment capture and stormwater runoff
 O1     Development design, density, layout,     S1.1      Construction works are designed, planned and                 R1 Complies
        and staging provide for erosion                    executed with respect to the principles of erosion
        control, drainage control and sediment             reduction, drainage management and sediment                  Erosion and sediment control measures can be conditioned
        capture and treatment during the                   capture in accordance with Appendix 2, Table A of            accordingly.
        construction phase.                                the Queensland State Planning Policy and
                                                           International Erosion Control Association Best
                                                           Practice Erosion and Sediment Control (BPESC)
                                                           2008; AND
                                                 S1.2      Construction works are designed and managed to
                                                           restrict the extent of clearing and soil exposure to that
                                                           necessary for access, and safe construction;
                                                           AND
                                                 S1.3      Clean stormwater is diverted or managed around or
                                                           through the site without increasing the concentration
                                                           of total suspended solids or other contaminants in the
                                                           flow and without causing erosion (onsite or offsite);
                                                           AND
                                                 S1.4      Cleared areas are effectively stabilised prior to rainfall
                                                           if works are delayed or works are not intended to
                                                           occur immediately; AND


                                                 S1.6      For buildings,
                                                           a) upstream runoff must be diverted around the
                                                           construction site; and
                                                           b) sediment barriers are provided downslope of
                                                           disturbed areas to prevent sediment washing into
                                                           gutters, drains and watercourses either on or off the
                                                           site; and
                                                           c) exposed soil and construction access must be
                                                           managed in accordance with International Erosion
                                                           Control Association Best Practice Erosion and
                                                           Sediment Control (BPESC) 2008; and
                                                           d) temporary or permanent downpipes are connected
                                                           to the stormwater system before laying the roof; or



December 2017                                           Cardno                                                           1
Log in to download the original file

Part B - Attachments A to D.PDF · 5.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.