Part B - Attachments A to D
Attached to the e-mail Other Change Application – 132002.220285.5.
Specific Outcome Probable Solution Response
e) localised erosion is avoided by directing flow from
downpipes over non-erosive areas.
Works in a watercourse
O2 Construction activities within S2.1 Work within waterways must be undertaken in R2 Complies
watercourses are planned to prevent accordance with Best Practice Erosion and Sediment
erosion, construction failure and Control, Appendix I – Instream works, Sections 14 Stormwater control measures can be conditioned
associated sedimentation. and 16 International Erosion Control Association accordingly.
2008.
S2.2 Temporary vehicular crossings of waterways must be
designed and constructed to convey flows for the
50%AEP event and remain stable for all rainfall
events up to 10%AEP event.
December 2017 Cardno 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.