Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Part B - Attachments A to D

Attached to the e-mail Other Change Application – 132002.220285.5.

of 131

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Waste Management Code
Table 14-60
Specific Outcome                                  Probable Solution                                                   Response
Waste separation
O1    Development that generates several         S1.1      Construction, operational and demolition works are         R1 Complies
      classes of waste is designed so waste is             planned and managed in accordance PSP1131;                 Management of construction, operational and demolition
      collected, stored and disposed of in a               AND                                                        works can be conditioned accordingly.
      safe and ecologically sustainable
      manner.                                    S1.2      Adequate area is provided for on-site for the collection
                                                           and separate storage of recyclable, non-recyclable,
                                                           vegetative and hazardous materials in their specific
                                                           waste streams during construction, operational and
                                                           demolition works;
                                                           AND
O2    Waste storage areas provide for            S2.1      Waste storage areas allow for the separate storage of      R2.1 Complies
      adequate separation of all recyclable                different waste materials for reuse or recycling by—       The nature of the proposed use and its minimal
      and non-recyclable materials.                        a) providing sufficient area to store all recyclable       scale/intensity is not expected to produce enough waste to
                                                           material and recycling containers required; and            warrant identified waste storage areas. The minimal waste
                                                           b) sign posting the types of waste stored.                 accrued is intended to be stored in the enclosed space and
                                                                                                                      discarded in the Civic Centre bulk refuse bins.


Design and location of waste storage areas
O3    Waste storage areas are located so that    S3.1      Waste storage areas are designed and maintained in         R3 Complies
      they are convenient and safe to use and              accordance with PSP 9;                                     The nature of the proposed use and its minimal
      provide for convenient and safe                      AND                                                        scale/intensity is not expected to produce enough waste to
      collection by service vehicles;                                                                                 warrant identified waste storage areas. The minimal waste
                                                 S3.2      Waste storage areas are designed and located so            accrued is intended to be stored in the enclosed space and
                                                           they—                                                      discarded in the Civic Centre bulk refuse bins.
                                                           a) are easily accessed and convenient to use;
                                                           b) have unobstructed access for the collection of the
                                                           waste by service vehicles;
                                                           c) provide for sufficient space for safe entry and exit
                                                           and servicing by Council’s contractor without the need
                                                           for manual handling;
                                                           d) are clear of carparking bays, loading bays and
                                                           similar areas;
                                                           e) are clear of footpaths and pedestrian access;
                                                           f) are capable of being serviced by the collection



December 2017                                           Cardno                                                         1
Log in to download the original file

Part B - Attachments A to D.PDF · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.