Skip to the record
Search everything, all in one place.

Original source · versioned page text

Part B - Attachments A to D

Attached to the e-mail Other Change Application – 132002.220285.5.

of 131

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 Specific Outcome                                         Probable Solution                                                          Response
          b.   the infrastructure provided is capable
               of servicing the entire development;
               and
          c.   the materials used are consistent
               throughout the development.
 14.150 Alterations to services and utilities

 O16      Any alterations or repairs to infrastructure   S16.1      Any alterations or repair to infrastructure as a result of the   R16 Will Comply
          as a result of the development are made at                development are completed at the developer’s expense.
          no cost to Council




December 2017                                                    Cardno                                                               9
Log in to download the original file

Part B - Attachments A to D.PDF · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.