Original source · versioned page text
Part B - Attachments A to D
Attached to the e-mail Other Change Application – 132002.220285.5.
Specific Outcome Probable Solution Response
b. the infrastructure provided is capable
of servicing the entire development;
and
c. the materials used are consistent
throughout the development.
14.150 Alterations to services and utilities
O16 Any alterations or repairs to infrastructure S16.1 Any alterations or repair to infrastructure as a result of the R16 Will Comply
as a result of the development are made at development are completed at the developer’s expense.
no cost to Council
December 2017 Cardno 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.