Original source · versioned page text
Part B - Attachments A to D
Attached to the e-mail Other Change Application – 132002.220285.5.
Water Sensitive Design Code
Table 14-61
Specific Outcome Probable Solution Response
Maintenance of environmental values and water quality objectives
O1 Downstream ecosystems, properties S1.1 Development meets the applicable performance R1 Complies
and infrastructure are not adversely outcomes of the State Planning Policy Appendix 2
impacted by either changes to flow, SPP Code: Water Quality; The development area which forms part of the site is sited
water quality or ecosystem health away from waterways and areas with significant
AND environmental or heritage values.
caused by development.
S1.2 Design and construction methods for stormwater
quality treatment assets are in accordance with
Healthy Waterways Water By Design Guidelines;
AND
S1.3 Commitments are made to implement a cost effective
maintenance strategy for the life cycle of any
engineered water quality treatment device;
AND
S1.4 Water quality nutrient load modelling is undertaken in
accordance with Water by Design Music Modelling
Guidelines to demonstrate compliance with the SPP
nutrient reduction requirements;
AND
S1.5 Stormwater outlets that directly discharge to naturally
acidic environments are managed to prevent
eutrophication;
AND
S1.6 Suitable methods are incorporated to prevent the
spread of invasive environmental weed species at
stormwater outlets.
Water Demand
O2 Urban development reduces the need S2.1 Captured water is plumbed to be available for all R2.1 Will Comply
for mains water by capturing and external uses including gardening, irrigation, ponds
utilising run-off from appropriate areas and outdoor cleaning.
on site.
O3 Urban development reduces the need S3.1 Planting is in accordance with PSP 3 Landscaping R3.1 Complies
for mains water by eliminating Plans and Guidelines.
requirement for irrigation via the use The proposal forms part of greater Noosa Civic Shopping
the endemic plant landscaping design. Centre development which satisfies landscaping
requirements for the precinct.
December 2017 Cardno 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.