Part B - Attachments A to D

Attached to the e-mail Other Change Application – 132002.220285.5.

of 131

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 Specific Outcome                                   Probable Solution                                                  Response
                                                                                                                       Three existing car park trees are proposed to be removed in
                                                                                                                       order to accommodate the proposed development in the car
                                                                                                                       park. Planters are proposed to be included in the pay and
                                                                                                                       key pickup area.
                                                                                                                       Aside from these minor changes, no changes to existing
                                                                                                                       landscaping are not proposed.
 O4     Backflow devices or similar systems        S4.1      A suitable backflow prevention device is installed to     R4.1 Complies
        are installed, where necessary, to                   protect the drinking water within the reticulated water
        ensure water reuse facilities have no                supply in accordance with AS/NZS 3500:2003                See Attachment G – Hydraulic Services Plan for more
        impact on the quality of the town                    Plumbing and Drainage.                                    detail.
        mains water.
 Shire Business Centre
 O5     Within the Shire Business Centre site,               No solution provided.                                     R5 Complies
        as shown on Map SBC run-off
        treatment is contained within the                                                                              The proposed development is located in the existing
        developable areas of the site and                                                                              hardstand car parking area at the Noosa Civic shopping
        drainage lines are only used for final                                                                         centre. The proposed development will utilise existing bio-
        polishing of run-off;                                                                                          retention basins for drainage, as well as the proposed
                                                                                                                       drainage connection to the shopping centre.
        AND
                                                                                                                       See Attachment G – Hydraulic Services Plan for more
                                                                                                                       detail.
 O6     Within the Shire Business Centre site,               No solution provided.                                     R6 Complies
        as shown on Map SBC, on-site
        detention measures are contained                                                                               The proposed development is located in the existing
        within the developable areas of the                                                                            hardstand car parking area at the Noosa Civic shopping
        site, clear of drainage lines and Open                                                                         centre – clear of open space precincts. The proposed
        Space Precincts.                                                                                               development will utilise existing bio-retention basins for
                                                                                                                       drainage, as well as the proposed drainage connection to
                                                                                                                       the shopping centre.
                                                                                                                       See Attachment G – Hydraulic Services Plan for more
                                                                                                                       detail.
 Use of Natural Treatments and Systems
 O7     Natural treatment strategies, including    S7.1      No solution provided.                                     R7.1 Complies
        grass swales and bio-retention
        systems, vegetated filtration strips and                                                                       The proposed development will utilise existing bio-retention
        gross pollutant traps, are used                                                                                basins for drainage, as well as the proposed drainage
        wherever possible.                                                                                             connection to the shopping centre.
                                                                                                                       See Attachment G – Hydraulic Services Plan for more
                                                                                                                       detail.
 O8     Development design including density       S8.1      Integration of stormwater quality treatment is in         R8.1 Complies
        and scale provides adequate footprint                accordance Healthy Waterways Water Sensitive
        to integrate all elements of stormwater              Urban Design Guidelines for South East Queensland


December 2017                                             Cardno                                                        2
Log in to download the original file

Part B - Attachments A to D.PDF · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.