Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Part B - Attachments A to D

Attached to the e-mail Other Change Application – 132002.220285.5.

of 131

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 Specific Outcome                                  Probable Solution                                                Response
           b) provides an open space feel to
           this entry to Noosa; and
           c) maintains the character of
           adjacent areas.
 11.40 Development sequencing

 First stage

 O103    The first stage of development           S103.1   For the first stage of development—                      R103.2 Not Applicable
         consists of—                                         a) a gross floor area equivalent to 20% of any        The shopping centre already exists, the proposed car wash
           a) a shopping centre with a discount               Retail business Type 2 Shop gross floor area, is      will be located in the existing car park.
           department store, and associated                   constructed for
           car parking within Business                        non-Retail business prior to such Type 2 Shop
           Precincts B1 and B2;                               development operating; and
           b) a substantial amount of non-                    b) 40% of the gross floor area of non- Retail
           Retail business                                    business development is contracted for sale or
           development;                                       lease, prior to the Retail business Type 2 Shop
           c) the construction of Eenie Creek                 development operating;
           Road between Reef Street and                    AND
           Langura Street;                                 Two road accesses are constructed into the Shire
                                                  S103.2                                                            R103.2 Not Applicable
           d) the construction of Walter Hay               Business Centre site as part of the first stage of the
           Drive between Emu Mountain Road                 development.                                             No changes to existing access arrangements and
           and Eenie Creek Road;                                                                                    driveways are proposed.
           e) interim transport circulation and
           access strategies in the absence of
           the internal loop road being
           complete;
           f) an established landscape theme
           for the developed precincts;
           g) landscaped entry statements;
           h) a suitable stormwater
           management system;
           i) appropriate signage;
           j) commencement of the associated
           pedestrian and bikeway network
           and related external connections;
           and
           k) dedication of a substantial area
           of the southern part of the Shire




December 2017                                          Cardno                                                       19
Log in to download the original file

Part B - Attachments A to D.PDF · 5.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.