Appendix C - Code Assessment

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Flood Hazard Overlay Code



Table 8.2.6.3 - Criteria for assessable development

Performance outcomes                                                  Acceptable outcome                                                   Assessment
Floodplain protection, immunity and safety – for development areas
PO1                                                                   AO1
Development provides that for all flood events up to and              The finished flood level is not less than the minimum design         AO1 – Complies
including the DFE :                                                   levels specified in Table 8.2.6.4                                    The proposed development will allow for finished surface levels
                                                                                                                                           on both lots that are more than 0.3m above DFE/DSTE.
 a)   the safety of people on the site is protected; and
 b)   the risk of damage to property on the site is avoided or
      minimised as far as practicable.

PO2                                                                   AO2                                                                  AO2 – Complies
All lots have sufficient area that is above the DFE flood level or    The minimum area above flood level (flood free area) for each lot,   The proposal will allow for a flood free areas which are capable of
where modelling is not available, the highest recorded flood level,   is in accordance with Table 8.2.6.5.                                 supporting a 1000m2 house site and effluent disposal system on
to safely and adequately accommodate the intended use.
                                                                                                                                           each lot. The proposed building envelope associated with Lot 2
                                                                                                                                           has an area of approximately 6000m2.

PO3                                                                   AO3                                                                  AO3 – Complies
For reconfiguring a lot or operational works, development is          Development areas are not filled to reduce flood risk.               The development will not require filling to reduce flood risk.
undertaken in a manner that ensures:


 a)   natural hydrological systems are protected from erosion,
      scour or flood damage on the premises or other premises;
 b)   natural landforms and drainage lines are maintained to
      protect the hydraulic performance of waterways and flood
      plain; and
 c)   development integrates with the natural landform rather
      than modifying the landform to suit the development as far
      as practicable.
PO4                                                                   AO4.1
For reconfiguring a lot, development does not compromise the          Development provides an effective evacuation route that remains
safety of people resulting from the flood risk associated with        passable, with sufficient flood warning time, to enable people to
Log in to download the original file

Appendix C - Code Assessment .pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.