Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2021-05-17 General Committee Agenda

of 46

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                      17 MAY 2021




                                     Figure 3: Site characteristics


2.3. Surrounding Land Uses
Detached dwellings are located to the north, south and east of the site.
3.   ASSESSMENT
3.1. Superseded Planning Scheme Request
Under the Planning Act 2016 a person may within 1 year after commencement of the Noosa Plan
2020, make a SPS request.
A SPS request is a written request to Council:
      To accept, assess and decide a development application under a superseded planning
       scheme; or
      To apply a superseded planning scheme to a development that was accepted development
       (no approval required).
Under the Planning Regulation 2017, Council must decide whether or not to agree to a SPS request
within 30 business days after the request is received, which may be extended where the applicant
agrees in writing before the period ends. If no decision is made by Council within the required time
frame, the Council is taken to have agreed to the SPS request.
If the Council decides to agree or is taken to have agreed to the request, the superseded planning
application must be made within 6 months to Council or where the proposal is accepted development
under the SPS commence the use within 6 years of the Decision Notice being given.
3.2. Planning Schemes
The site is located in the Mary River Catchment Locality and is zoned Semi-Attached Housing under
the SPS. Under the SPS reconfiguration of a lot requires a code assessable development
application.
The subject site is also identified by the SPS’s Bushfire Hazard Overlay and Flood Hazard Overlay.
An application to reconfigure the lot would be required to address the requirements associated with
these overlays and the Engineering Works Codes, including the Water Sensitive Design Code.
Notably the proposal does not trigger the Biodiversity Overlay Code.

                                                                                    Page 7 of 46
Log in to download the original file

2021-05-17 General Committee Agenda(PDF, 3MB).pdf · 3.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.