Council archive · source document
23688 DA - COMPILED Decision Notice [As Published] · 132004.240015.4
NOOSA COUNCIL IDAS Development Application Decision Notice 8
Local Laws, Policies & State Regulation
Requirements
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
Advice
1. The Environmental Protection Regulation 1998 and Local Law No. 12 prevents a builder or building
contractor carrying out building work on a building site in a way that makes or causes audible noise to be
made from the building work on: -
a) Monday to Saturday, before 7:00am or after 6:30pm
b) Sunday or public holiday, at any time.
A maximum penalty of $1,500 applies to an offence under this legislation.
2. Pursuant to the Building and Construction Industry (Portable Service Leave) 1991 Act if the cost of
operational works exceeds $80,000, then a portable long service levy is required to be paid. In
accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the
Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the
requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational
works over the site.
KP o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23688 DA - COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 45 KB (small file)
- File type
No other editions are linked here.