NOOSA COUNCIL IDAS Development Application Decision Notice 7
24.9. A RPEQ is to be engaged by the client to oversee the piling works and copies of all inspection
reports are to be submitted to Council within 5 business days of the inspection taking place;
24.10. The applicant’s Geotechnical engineer will be required to be on site during major excavation works.
The applicant’s Geotechnical engineer is to advise on and direct any temporary or permanent
retaining systems to be used. If there is a risk of sand movement occurring, all work shall be
suspended until such steps, approved by the applicant’s Geotechnical engineer have been taken
to ensure no further slippage will result.
General
25. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
Additional Conditions 17/03/05
26. The existing deck illustrated on plan number 0324SK.01 (C) is to be removed and the area is to be
reinstated with dunal vegetation endemic to the Eastern Beaches Locality.
27. The landscaped deck at level 1 is to be setback a minimum 1.5 metres from both side boundaries to
enable landscaping to be implemented to enhance slope stability.
Additional Conditions 11/04/07
Land Use
28. External materials and finishes shall comprise predominately of colours and hues of the surrounding
natural landscape.
Land Development
Car Parking
29. Carparking shall be provided within the site generally as shown on drawing number 1.3 dated 20/12/2006
by SBT designs, except as modified herein.
30. The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004 for user
class 1A with a minimum head clearance (headroom) at any point of 2.2m.
Stormwater Drainage
31. Stormwater runoff from the access driveway shall be collected on site and directed into the stormwater
disposal system for the development. All surface runoff and necessary drainage structures to connect the
runoff from the access driveway to the stormwater drainage system shall be contained within the subject
site.
32. The construction of the stormwater disposal system shall be supervised by a suitable qualified RPEQ.
Certification, prepared by a suitable qualified RPEQ, stating that the completed works achieve the design
intent shall be submitted to Council prior to the commencement of the use.
Earthworks
33. All earthworks and the construction of the foundation system shall be supervised by a suitable qualified
RPEQ. Certification, prepared by a suitable qualified RPEQ, stating that the completed works achieve the
design intent and will not have an adverse affect on the stability of the subject site and/or buildings
constructed on the subject site and/or adjoining structures and/or adjoining lands shall be submitted to
Council prior to the commencement of the use.
KP o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23688 DA - COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 45 KB (small file)
- File type
No other editions are linked here.