As can be seen in Tables 1 to 3 above, the revised car parking supply meets the minimum requirements,
whilst the revised motorcycle and bicycle provisions exceed the minimum requirements.
On this basis, the parking provisions of the revised scheme are considered acceptable.
Issue – Bicycle Parking
It is unclear how the proposed bicycle parking will be accessed when the carparks are occupied.
Information Required
10. Provide amended plans with accessible bicycle parking.
TTM Response
As seen in the revised plans included in Attachment 1, the previously proposed bike parking in front of
parking spaces has now been removed. Bicycle parking is now located in the following positions:
• 3 bicycle spaces at the end of the car parking level, directly accessible for users walking their bicycles
past the PWD space shared area and vacant area adjacent to car space R5 (1.5m clear width access path
available)
• 2 bicycle spaces located against the wall of the amenities block main on the Duke Street level, directly
accessible for users walking their bicycles along the main building pedestrian entry corridor (1.0m clear
width access path available).
All bicycle parking spaces in the revised plans are considered to provide a suitable level of accessibility.
Issue – Carpark Turnaround Bay
TTM’s Traffic Engineering Report states that the Parking Aisle Extension, although not compliant with the
standard 1 metre extension, meets the performance outcome of its intended use. Insufficient information has
been provided demonstrating a B99 vehicle can manoeuvre the turnaround bay and exit the site in a forward
gear.
Information Required
16. Provide additional detail demonstrating that the turnaround bay at the end of the aisle is sufficient to
allow B99 vehicles to manoeuvre the site and exit in a forward gear. The additional detail must be prepared
by a suitably qualified person (RPEQ) and include, but not be limited to:
a. assume proposed carparks R2, R3 and R5 are occupied.
TTM Response
TTM has completed updated swept path analysis for all typical car parking spaces based on the revised car
park layout.
Page | 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment C_Traffic_Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.