These swept paths are included in Attachment 2. This swept path analysis includes the new spaces at the
end of the car park, along with the typical 90-degree angle/parallel car spaces previously tested.
Swept paths have also been tested to show that a B99 vehicle can turn around at the dead-end of the car
park using the parking aisle and turning zone only, assuming all car spaces adjacent are occupied. This will
allow a car to exit the site in a forward manner if all parking spaces in the car park are full. The swept paths
show maneuvering for all spaces (and vehicle turnaround) is possible with no worse than a 3-point turn
required for any one entry or exit movement. On this basis, vehicle maneuvering for the car park is
considered acceptable.
Other than the performance solution for blind aisle extension, the revised car parking layout meets all the
respective design requirements of AS2890.1:2004.
Overall, TTM considers the revised parking layout to be functional and fit-for-purpose.
TTM trusts that the above information is sufficient to address the traffic engineering items raised within the
Information Request letter.
If you have any queries relating to the information provided, please contact myself on (07) 3327 9500.
Yours sincerely,
Ryan Bradley
Senior Associate Director – Traffic
RPEQ No. 19178
TTM Consulting Pty Ltd
Attachments:
1) Revised Development Pans
2) Updated Swept Path Plans
Page | 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment C_Traffic_Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.