Skip to the record
Accept no imitations.

Council archive · source document

003 ECM_24525978_v1_Town planning consent TPC 2486 · 51992.547.01

of 4

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Document Set ID: 24525978
Version: 1, Version Date: 09/02/2026


[OCR of page images]
Town Planning Consent Permit - TPC 2486 Page 3

10.

11.

12.

13.

14.

15.

16.

Document Set ID: 24525978
Version: 1, Version Date: 09/02/2026

If payment is not proposed to be made prior to the issue of Building Approval, a cash
bond or trading bank guarantee for the required amount is to be lodged, prior to the
release of that Approval. The contribution is then required to be made within
fourteen (14) days of the issue of Building Approval.

The footpath across the frontage of the site is to be upgraded by the provision of a
1.2 metres wide concrete footpath and the forming, grassing and topsoiling of the
remaining area to the satisfaction of the Shire Engineer. The footpath is to be
generally located 0.9 metres from the property alignment and is to be integrated with
any existing slopes and vegetation within the road reserve.

The developer shall bear the cost of alteration of any public utility or other facilities
necessitated by the development of the land or associated construction works
external to the site.

Connection to Council's existing water supply and sewerage reticulation systems at
the developer's expense to the standards and requirements of the Shire Engineer.

The developer shall provide a metered water connection from the water supply
system to the proposed development, in accordance with Council's standards and to
the satisfaction of the Shire Engineer.

Roof and surface water is to be collected on site and is to be discharged through a
single underground drain line into existing drainage in Grant Street to the satisfaction
of the Shire Engineer. A Building Approval shall not be granted until the Shire
Engineer has approved of the drainage scheme.

Provision of approved refuse containers in accordance with the requirements of the
Refuse Management Regulations of 1983 for the storage and collection of refuse to
the satisfaction of Council's Environmental Health Officer.

Provision of an imperviously paved and drained area to accommodate all refuse
containers to the reasonable satisfaction of Council's Environmental Health Officer.
This area is to be aesthetically screened from any road frontage or adjoining property
boundary and is to be setback a distance of two (2) metres from any road frontage.
A suitable hosecock and hoses are to be located in the vicinity of the refuse container
area.

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

003 ECM_24525978_v1_Town planning consent TPC 2486.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.