Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

003 ECM_24525978_v1_Town planning consent TPC 2486 · 51992.547.01

of 4

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Document Set ID: 24525978
Version: 1, Version Date: 09/02/2026


[OCR of page images]
Town Planning Consent Permit - TPC 2486 Page 2

Document Set ID: 24525978
Version: 1, Version Date: 09/02/2026

There is to be no detrimental effect upon the amenity of the neighbourhood by reason
of the creation of excessive noise, lighting nuisance or other emissions.

The open space and setback areas are to be landscaped in accordance with Council's
Policy on Landscaping Guidelines and a properly prepared landscape plan to be
submitted to and approved by the Shire Planner, prior to the issue of a Building
Approval. Such landscaping is to be completed in accordance with the approved
landscape plan, prior to the premises being occupied and maintained at all times
thereafter to the reasonable satisfaction of the Shire Planner.

Any fencing provided in conjunction with the development is to be setback an
average of two (2) metres to any road frontage pursuant to clause 36 (6) (c) of the
Schedule to the Planning Scheme.

Existing trees on the site and within road reserves are to be retained, except where
required to be removed due to building operations or the conduct of the approved
use. The landscape plans referred to above are to denote areas of existing vegetation
or existing trees proposed to be retained.

Construction work and other associated activities are permitted only during the hours
of 7.00 a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on public
holidays, except where extended hours are approved by the Building Surveyor.

Any advertising sign or device is to comply with the provisions of Council's policies
on advertising.

Payment of contributions in accordance with Council's Policy on Water Supply and
Sewerage Headworks, current at the time of Building Approval. An estimate only

of the charges as at November 1992, under the current policy.is as follows:—

Water Supply - $2257.86
Sewerage - $1038.62

TOTAL: $3296.48

Please note that the headworks charges will alter in accordance with Price Index
variations or if any amendment is made to Council's policy.

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

003 ECM_24525978_v1_Town planning consent TPC 2486.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.