Original source · versioned page text
26-08-31_Lot 2 Taylor Ct Cooroy_DA Issue J
Attached to the e-mail Request to suspend the Appeal Period & Reps - MCU26/0040 OPW26/0066 & RAL26/0013.
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
01 SITE 3D VIEW
-
NORTH
J 26.08.31 DA Revision ST DJ
i 26.05.29 DA Revised civil Issue C inserted ST DJ
H 26.05.26 Revised civil Issue C inserted ST DJ
G 18.05.26 Revised Area schedule ST DJ
F 14.05.26 Concrete panel to caretakers ST DJ
E 14.05.26 Preliminary WD Buildings A & B for coordination ST DJ
D 14.05.26 RFI response with Civil Rev B added ST DJ
C 01.05.26 Revised stages & bin locations ST DJ
B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
A 27.02.26 Preliminary DA Issue ST DJ
REMI RAFTER
LOT 18 TAYLOR COURT
COOROY
02 BUILDING A 3D VIEWS
-
ST DJ
NOTE: As Indicated 03.12.25
MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND 2025-68 01
ARTIST IMPRESSION - COLOURS ARE INDICITIVE ONLY ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT) DA DRAWINGS J
GSPublisherVersion 647.0.97.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (26-08-31_Lot 2 Taylor Ct Cooroy_DA Issue J.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 8 (of 33)
Section 2
NOTE:
ARTIST IMPRESSION - COLOURS ARE INDICITIVE ONLY
01 BUILDING B
-
NORTH
02 BUILDING C
-
J 26.08.31 DA Revision ST DJ
i 26.05.29 DA Revised civil Issue C inserted ST DJ
H 26.05.26 Revised civil Issue C inserted ST DJ
G 18.05.26 Revised Area schedule ST DJ
F 14.05.26 Concrete panel to caretakers ST DJ
E 14.05.26 Preliminary WD Buildings A & B for coordination ST DJ
D 14.05.26 RFI response with Civil Rev B added ST DJ
C 01.05.26 Revised stages & bin locations ST DJ
B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
A 27.02.26 Preliminary DA Issue ST DJ
REMI RAFTER
LOT 18 TAYLOR COURT
COOROY
3D VIEWS
ST DJ
03 BUILDING D As Indicated 03.12.25
-
MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND 2025-68 02
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT) DA DRAWINGS J
GSPublisherVersion 647.0.97.0
Section 3
01 SOUTH WEST VIEW
- LEVEL 1
NORTH
J 26.08.31 DA Revision ST DJ
i 26.05.29 DA Revised civil Issue C inserted ST DJ
H 26.05.26 Revised civil Issue C inserted ST DJ
G 18.05.26 Revised Area schedule ST DJ
F 14.05.26 Concrete panel to caretakers ST DJ
E 14.05.26 Preliminary WD Buildings A & B for coordination ST DJ
D 14.05.26 RFI response with Civil Rev B added ST DJ
C 01.05.26 Revised stages & bin locations ST DJ
B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
A 27.02.26 Preliminary DA Issue ST DJ
02 NORTH WEST VIEW
- LEVEL 1
REMI RAFTER
LOT 18 TAYLOR COURT
COOROY
NOTE: 3D VIEWS
ST DJ
ARTIST IMPRESSION - COLOURS ARE INDICITIVE ONLY As Indicated 03.12.25
MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND 2025-68 03
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT) DA DRAWINGS J
GSPublisherVersion 647.0.97.0
Section 4
Chainwire Fence
8°57'15" 213.928
550
FFL 125.00 FFL 125.00 BUILDING D FFL 125.00 FFL 125.00
7.0
12 248 m2 125 m2 125 m2 125 m2 125 m2 125 m2 125 m2 125 m2 125 m2 125 m2 125 m2 125 m2 125 m2 125 m2 125 m2 125 m2 125 m2 250 m2
6.5
TENANCY TENANCY TENANCY TENANCY TENANCY TENANCY TENANCY TENANCY TENANCY TENANCY TENANCY
18
17 TENANCY TENANCY 18 18
17 17 TENANCY TENANCY 18 18
17 17 TENANCY TENANCY 18 18
17 17 TENANCY 18
17
12
18 18 18 18 18 18 18 18 18 18 18 18 16 16 16 16 16 16 16 16
17 17 17 17 17 17 17 17 17 17 17 17 15 15 15 15 15 15 15 15
16 16 16 16 16 16 16 16 16 16 16 16 14 14 14 14 14 14 14 14
15
14
13
12
11
10 37
15 15
14 14
13 13
12 12
11 11
10 10 38 39
15 15
14 14
13 13
12 12
11 11
10 10 40 41
15 15
14 14
13 13
12 12
11 11
10 10 42 43
15 15
14 14
13 13
12 12
11 11
10 10 44 45
15 15
14 14
13 13
12 12
11 11
10 10 46 47
15 13
14 12
13 11
12 10
11 9
10 8
48 49 13 13
12 12
11 11
10 10
9 9
8 8
50 51 13 13
12 12
11 11
10 10
9 9
8 8
52 53 13 13
12 12
11 11
10 10
9 9
8 8
54 13
12
11
10
9
8
9 9 9 9 9 9 9 9 9 9 9 9 7 7 7 7 7 7 7 7
8
7
6
5 MEZZ. MEZZ. MEZZ.
8 8
7 7
6 6
5 5 MEZZ.
8 8
7 7
MEZZ.
6 6
5 5 MEZZ. MEZZ.
8 8
7 7
6 6
5 5 MEZZ.
8 8
7 7
MEZZ.
6 6
5 5 MEZZ. MEZZ.
8 8
7 7
6 6
5 5 MEZZ.
8 6
7 5
6 4
5 3
MEZZ. MEZZ. MEZZ.
6 6
5 5
4 4
3 3
MEZZ. MEZZ. 6 6
5 5
4 4
3 3
MEZZ. MEZZ. 6 6
5 5
4 4
3 3
MEZZ. 6
5
4
3
4
3
2
47 m2 47 m2 UP UP 47 m2
4 4
3 3
2 2
4 4
3 3
47 m2 UP UP 47 m2
2 2
47 m2 UP UP 47 m2
4 4
3 3
2 2
4 4
3 3
47 m2 UP UP 47 m2
2 2
47 m2 UP UP 47 m2
4 4
3 3
2 2
47 m2 UP
4 2
3 1
2 UP 47 m2 47 m2 UP UP 47 m2
2 2
1 1 47 m2 UP UP 47 m2 2 2
1 1 47 m2 UP UP 50 m2 2 2
1 1 52 m2 UP 2
1
nce
1 1 1 1 1 1 1 1 1 1 1 1
UP
e Fe
0 5 m2 5 m2 5 m2
inwir
6. 5 m2 5 m2 5 m2 5 m2 5 m2 6 m2
12
mb
Cha
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws
4 CAR SPACES 4 CAR SPACES 4 CAR SPACES 4 CAR SPACES 4 CAR SPACES 4 CAR SPACES 4 CAR SPACES 4 CAR SPACES
13700
13200
13200
SCREENED BIN ENCLOSURE 3x3m MIN POROUS PAVED STAFF
5 / 1.3m3 & BIN WASH DOWN RECREATIONAL AREA (COVERED
.5 AREA REFER CIVIL DETAILS OUTDOOR TABLE & SEATING) AS
125 URBAN ALUMINIUM COVERED PICNIC
10150 150 10000 150 10000 150 10000 150 10000 150 10000 150 10000 150 SETTING - WIDE (MODULAR-CODE 47-
MCPS2) 2200L X 2400W X 2300H
EMT J
mb
mb
.0 ws mb STAFF
SP197517 125
AREA
FFL 125.00 FFL 125.00 FFL 125.00 FFL 125.00
ws ws
UP UP UP UP UP UP ws ws UP UP UP UP UP UP UP
crete
1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3 3 3 3
70 m2
4 4 4 4 4 4 4 4 4 4 4 4 4
5 m2 5 m2
5 5 5 5 5 5 5 5 5 5 5 5 5
169 m2 169 m2 173 m2 173 m2 173 m2 175 m2 173 m2 173 m2 173 m2 173 m2 173 m2 173 m2 175 m2
6 6 6 6 6 6 6 6 6 6 6 6 6
7 7 7 7 7 7 7 7 7 7 7 7 7
Chainwire Fence
Con
8 8 8 8 8 8 8 8 8 8 8 8 8
9 9 9 9 9 9 9 9 9 9 9 9 9
10 10 10 10 10 10 10 10 10 10 10 10 10
11 11 11 11 11 11 11 11 11 11 11 11 11
12 12 12 12 12 12 12 12 12 12 12 12 12
13 13
14 14
15 15
16 16
13 13
14 14
15 15
16 16
13 13
14 14
15 15
16 16
ws ws 13 13
14 14
15 15
16 16
13 13
14 14
15 15
16 16
13 13
14 14
15 15
16 16
13
14
15
16
17 17 17 17 17 17 17 17 17 17 17 17 17
18 18 18 18 18 18 18 18 18 18 18 18 18
Chainwire Fence
Section 5
ws ws
TENANCY 36 TENANCY 35 TENANCY 34 TENANCY 33 TENANCY 32 TENANCY 31 TENANCY 30 TENANCY 29 TENANCY 28 TENANCY 27 TENANCY 26 TENANCY 25 TENANCY 24
13 CAR SPACES
14 CAR SPACES
124.5
12 CAR SPACES
11 CAR PARKS
Shelter
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. ws ws MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
59 m2 59 m2 60 m2 60 m2 60 m2 60 m2 60 m2 60 m2 60 m2 60 m2 60 m2 60 m2 60 m2
ws ws 2
BUILDING B BUILDING C
ws ws
SP197517
266°0
7
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
103.8
117 m2 60 m2 60 m2 60 m2 60 m2 ws ws 60 m2 60 m2 60 m2 60 m2 124.60
0 m 2
60 m2 60 m2
2'45"
18 18 18 18 18 18 18 18 18 18 18 18
17 17 17 17 17 17 17 17 17 17 17 17
16 16 16 16 16 16 16 16 16 16 16 16
15 15 15 15 15 15 15 15 15 15 15 15
14 14 14 14 14 14 14 14 14 14 14 14
13 13 13 13 13 13 13 13 13 13 13 13
ws ws
2.016 ha 19
12 12 12 12 12 12 12 12 12 12 12 12
11
10
TENANCY 12 TENANCY 13 11 11
10 10
TENANCY 14 TENANCY 15 TENANCY 16 11 11
10 10
TENANCY 17 11 11
10 10
TENANCY 18 TENANCY 11 11
10 10
TENANCY 20 TENANCY 21 11 11
10 10
TENANCY 22 TENANCY 23 11
10 5 m2
"
9 9 9 9 9 9 9 9 9 9 9 9
8 8 8 8 8 8 8 8 8 8 8 8
5'20
7 7 7 7 7 7 7 7 7 7 7 7
6 6 6 6 6 6 6 6 6 6 6 6
102.5
5 5 5 5 5 5 5 5 5 5 5 5
4 4 4 4 4 4 4 4 4 4 4 4
3
2
1
3 3
2 2
1 1
3 3
2 2
1 1 ws ws 3 3
2 2
1 1
3 3
2 2
1 1
3 3
2 2
1 1
3
2
1
UP 368 m2 UP UP UP UP UP UP UP UP UP UP UP
4
SHARED
114°
5 m2 5 m2 AREA B
95
ws ws
189 m2 189 m2 189 m2 190 m2 17300
190 m2 189 m2 189 m2 189 m2 189 m2 189 m2 190 m2
ws ws
FFL 124.50 FFL 124.50 mb FFL 124.50 FFL 124.50 3.5
mb 12
STORM
IN THIS
7000
SCREENED BIN ENCLOSURE
Chain
3 / 1.3m3 & BIN WASH DOWN
AREA REFER CIVIL DETAILS 2m HIGH FENCE
WATER
5 m2 5 m2 5 m2 5 m2 5 m2 5 m2
wire F
TO BOUNDARY
VICINIT
RECOR
EMT G
868 m2
WARNIN
mb
ence
5400
mb
INFRAS
Y PLOT
DS ONLY
19 CAR SPACES 11500 20 CAR SPACES Chainwire Fen
2m HIGH FENCE ce
G
SP197
TO BOUNDARY
TRUCT
TED FR
.
51
7000
7
URE
941 m2
OM
SCREENED BIN
ENCLOSURE 3 / 1.3m3 &
Con
BIN WASH DOWN AREA crete
FFL 124.40
Demountable BUILDING A FFL 124.40 UP
1
2
3
4
5 BALCONY
REFER CIVIL DETAILS
4545RD
OVER 18 m2
6
7
8
140 m2 138 m2 163 m2 163 m2 163 m2 163 m2 163 m2 163 m2 188 m2 188 m2 147 m2
9
10
11
Dwa
12
Shelter
13
y
14
15
16
Demountable
Taylor Court
17
UP UP UP UP UP UP UP UP UP UP 18
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
RT
4 4 4 4 4 4 4 4 4 4
COU
5 5 5 5 5 5 5 5 5 5
6 6 6 6 6 6 6 6 6 6
TENANCY TENANCY TENANCY 9 TENANCY 8 TENANCY 7 TENANCY
17836m2 TENANCY 5 TENANCY 4 TENANCY 3 TENANCY 2 TENANCY 1 EMT AA S
7 7 7 7 7 7 7 7 7 7
LOR
8 8 8 8 8 8 8 8 8 8
9 9 9 9 9 9 9 9 9 9
TAY
10 10 10 10 10 10 10 10 10 10
11 11
12 12 Shelter 11 11
12 12
11 11
12 12
11 11
12 12
11 11
12 12
11 10 SP316697
13 13 13 13 13 13 13 13 13 13
215 m2
14 14 14 14 14 14 14 14 14 14
15 15 15 15 15 15 15 15 15 15
16 16 16 16 16 16 16 16 16 16
E
17 17 17 17 17 17 17 17 17 17
18 18 18 18 18 18 18 18 18 18
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZANINE
47 m2 47 m2 55 m2 55 m2 55 m2 55 m2 55 m2 55 m2 63 m2 63 m2 OVER 65 m2 WARNING 566 m2
ELECTRICAL INFRASTRUCTURE IN THIS VICINITY
PLOTTED FROM RECORDS ONLY.
EMT C
150
188°57' 138.787 SP197517
12
EMT B
01 SITE PLAN
2.
5
16.737
SP197517
FFL 121.40 FFL 121.40
- LEVEL 1 Scale @ A3 1:550
AREA
AREA SCHEDULE
SCHEDULE Existing Building 9991 75
150 7200 150 7200 150 8545 150 8545 150 8545 150 8545 150 8545 150 8545 150 9841 150 9841 150 8645 150
279°03'35"
184 m2
BUILDING A BUILDING B BUILDING C BUILDING D
LEVEL 1 MEZZ. LEVEL 1 MEZZ. LEVEL 1 MEZZ. LEVEL 1 MEZZ.
EMT I
T1 147.00 65.00 T 12 368.00 120.00 T 17 190.00 60.00 T 37 248.00 94.00
SP197517
SP1975
T2 188.00 63.00 T 13 189.00 60.00 T 18 189.00 60.00 T 38 125.00 47.00
EMT A
T3 188.00 63.00 T 14 189.00 60.00 T 19 189.00 60.00 T 39 125.00 47.00 RP DESCRIPTION EMT Section 6
H
.92
17
T4 163.00 55.00 T 15 189.00 60.00 T 20 189.00 60.00 T 40 125.00 47.00 LOT 2 (18) SP197517
5
04"
T5 163.00 55.00 T 16 190.00 60.00 T 21 189.00 60.00 T 41 125.00 47.00 REGISTERED PLAN: SP197518
3'4
3
NORTH
.81
T6 163.00 55.00 T 31 175.00 60.00 T 22 189.00 60.00 T 42 125.00 47.00 LOCALITY: COOROY
9°4
19
LOCAL AUTHORITY: Noosa Shire Council
12
T7 163.00 55.00 T 32 173.00 60.00 T 23 190.00 60.00 T 43 125.00 47.00
T8 163.00 55.00 T 33 173.00 60.00 T 24 176.00 60.00 T 44 125.00 47.00 TOTAL SITE AREA 20,160sqm
T9 163.00 55.00 T 34 173.00 60.00 T 25 173.00 60.00 T 45 125.00 47.00 J
T 10 138.00 47.00 T 35 169.00 60.00 T 26 173.00 60.00 T 46 125.00 47.00 SITE COVER ( 44.51%) 8,974.0sqm REMI RAFTER
T 11 140.00 47.00 T 36 169.00 60.00 T 27 173.00 60.00 T 47 125.00 47.00
LANDSCAPE REQUIRED (15%) 3,024 sqm LOT 18 TAYLOR COURT
T 28 173.00 60.00 T 48 125.00 47.00 LANDSCAPE PROVIDED (15.09%) 3,043 sqm COOROY
T 29 173.00 60.00 T 49 125.00 47.00 J 26.08.31 DA Revision ST DJ
T 30 173.00 60.00 T 50 125.00 47.00 CAR PARKING REQUIRED (12,096sqm) 125.96 Parks i 26.05.29 DA Revised civil Issue C inserted ST DJ
CAR PARKING PROVIDED 126 Parks H 26.05.26 Revised civil Issue C inserted ST DJ
T 51 125.00 47.00 ST DJ
T 52 125.00 47.00 MOTORBIKES PROVIDED 8 Parks STAGE LEGEND G 18.05.26 Revised Area schedule ST
ST
DJ
DJ
T 53 125.00 47.00
126 Parks
STAGE 1 BOUNDARY
F
E
14.05.26
14.05.26
Concrete panel to caretakers
Preliminary WD Buildings A & B for coordination ST DJ As Indicated 03.12.25
T 54 250.00 102.00 IMPERVIOUS AREA (84.90%) 17,134.0 sqm STAGE 2 BOUNDARY
D
C
14.05.26
01.05.26
RFI response with Civil Rev B added
Revised stages & bin locations
ST
ST
DJ
DJ 2025-68 04
1779.00 615.00 2157.00 720.00 2539.00 840.00 2498.00 948.00
STAGE 3 BOUNDARY B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
SUBTOTAL 2394.00 2877.00 3379.00 3446.00 STAGE 4 BOUNDARY A 27.02.26 Preliminary DA Issue ST DJ DA DRAWINGS J
MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND
GROSS FLOOR AREA: Level 1 8973.00 Mezzanine 3123.00 TOTAL: 12096.00 ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT) STAGE 5 BOUNDARY
GSPublisherVersion 647.0.97.0
SITE / FLOOR PLAN LEVEL 1-OPT 05
[OCR of page images]
Chainwire Fence
8°57'15"
1 BUILDING
125 hi
213.928
FFL 126.00
250, m?
TENANCY
45 46
MEZ
47
-— 1 Poe — 3
Tem
L wwe |
— = SS ee a SS Gee eee eae SESS
4 CAR SPACES. |, 4CaR Spaces | |b 4car SPACES | 4 CAR SPACES
T T T + Le T T 7 1 T T
| I -—+—_+ + 5 ‘a SCREENED BIN ENCLOSURE 3x3m MIN ROROUS PAVED STAFF
7 5/ 1.3m? & BINWASH DOWN — ECREATIONARAREA (COVERED
AREA REFER CIVIL DETAILS ol JOR TABLE @ SEATING) AS
— Se Se EE }. — URBAN JMINIUM COMBRED PICNIC
vr ( J “torso ~~ iso, 10000150, 10000 | 150, 10000 150, 10000 [-fs0, “to000 150, 10000150, 1 SETTING - WIDE (MODULAR:BODE 47-
| ' 7 ” a” * ” ” ” a” | MCPS2) 2200L X JOW X 2300
n |
SP1ORI7 Il. 4 ea
ih. i FFL 125.00 ] i}
s wsl '
tl. we | el
2
I Isms i 173 me 175 [70% é ‘
hs wll Fd | é ;
TENANCY 34) TENANCY 33 fl 1 va TENANCY 26 § TENANCY 25 | TENANCY 24 al i
4 al ze ; al '
is _B Bl weze 5 PETE ep ueze | iieze | | z a
Ws 2 1s wel ging 4) < a i
a We eT Pe: E |
8 a | ARG A
2 i | Wed MEZZ, MEZZ | = 4 ‘
3 s “| wd 60 m? 60 m? i
% i Wd vanev2e| TeNanov ofA
— TENANCY 12 iL 1 ENANCY 22 | TENANCY 23: | mo &
= ' N
3 368 m? 7 | 1 t “ | SHAREt : / f #
a '
2 L 5 ine Wien j AREA : ix
s wsl '
i
lhe 17300 i oat 189 m2 190 m2 i / f
FFL 124.50 FFL 124.50
W 1 Aa a = \ / /
a y
Fas -
r= ee _LYCG}-;-HIY 4. \ ~/ Vy / 43
z
666 ESKER 23
<5
2 A \ 868 m? | BS tis
a v I QZ ais
° 2322)
19 CAR SPACES ES j SB2Ralz
o 2m HIGH FENCE . oo T “an 0 BIO
3 ‘TO BOUNDARY i S28
= — a cae
g SI . J u6
a poof a EE EE EE EE EEE EEE EEE EEE ee a
0 & ~ aS
| - = 7 Zim
aT SCREENED BIN |
Loe 4Te 7 ONT © 47 e 2 . 7577 ON ENCLOSURE 3 / 1.3m? & iP }
BIN WASH DOWN AREA Ce fo /
Dsroursta) FFL 124.40 ae BUILDING A EFER CIVIL DETAILS
1 140 m? 438 m= 163 m? 163 m? exh 163 m?
1 Shelter
Table
L Si
‘ TENANC NANCY ENANCY 1.~ h
' 1 10 | ‘SP316697
SSMEZZ MEZZ. NY MEZZANINE BI
‘ ey 47 m2 OvERG3 m* | [i warns 566 m2
1 aan Js Forma, INEpASTRUCTURE INTHIS VicKry
SS; = ‘ PLOfTED FROM RECORDS ONLY.
V Sh is jal!
.
AREA SCHEDULE
=P ===S==e
/07\ SITE PLAN
Ny, LEVEL 1
ewer wm ew @@ eee ew Oo @ OO OO OO @ @ 19% SIT DOO eT ee
Scale @ A3 1:550
BUILDINGA BUILDINGB BUILDING C BUILDING D fy
LeveL. —_[MEzz. LevEL1 | MEZz. LEVEL. MEZZ. LEVEL MEZZ. 5 f
fra [147.00 [65.00 |t12][368.00 [12000 |T17 [190.00 [60.00 |137]248.00 [94.00 sore f
T2 [188.00 [63.00 |T13|189.00 [60.00 _|t18|189.00 [60.00 138 4125.00 [47.00
T3_ [188.00 [63.00 |t14|189.00 [60.00 _|T19|189.00 [60.00 [139 ]125.00 [47.00 RP DESCRIPTION EMT,
T4 [163.00 }55.00 T15 }189.00 |60.00 T20 ]189.00 | 60.00 740 $125.00 _|47.00 LOT 2 (18) SP197517
ts [163.00 [55.00 |t16]190.00 [60.00 [t21 [189.00 [60.00 [141 ]125.00 [47.00 REGISTERED PLAN: Gb 107818
té [163.00 [55.00 [131 ]175.00 [60.00 _|t22]189.00 [60.00 [t42]125.00 [47.00 LOCAL AUTHORITY: Noosa Shire Council
T7 [163.00 [55.00 |132]173.00 [60.00 _[|T23|190.00 [60.00 [143412500 [47.00 a
T8 [163.00 |55.00 733 J173.00 |60.00 T24]176.00 |60.00 744 $125.00 |47.00 TOTAL SITE AREA 20,160sqm
r9 [163.00 [55.00 |r34]173.00 [60.00 _|t25 [173.00 [60.00 [145 J125.00 [47.00 L \
T10 {138.00 [47.00 T35 J169.00 [60.00 T26 [173.00 [60.00 T46 [125.00 [47.00 SITE COVER ( 44.51%) 8,974.0sqm Client REMI RAFTER
rai 140.00 [47.00 |t36]169.00 [60.00 _[|t27 173.00 [60.00 [147 J125.00 [47.00 LANDSCAPE REQUIRED (15%) 3,024 sqm LOT 18 TAYLOR COURT
fr28 [173.00 [60.00 |r48 [125.00 [47.00 LANDSCAPE PROVIDED (15.09%) 3,043 sqm COOROY
29 [173.00 [60.00 |T49 [125.00 [47.00
J 26.08.31 DA Revision st DJ ses
730 |173.00 [60.00 _|150|125.00 [47.00 GAR PARKING REQUIRED (12,096sqm) 125.96 Parks i 26.05.29 DA Revised civil Issue C inserted st DJ building
51 $125.00 147.00 ‘AR PARKING PROVIDED 126 Parks H 26.05.26 Revised civil Issue C inserted ST DJ} Drawn ST Checked py |Suncoas t
irs2 [125.00 [47.00 MOTORBIKES PROVIDED a8 Parks STAGE LEGEND G 180526 Revised Wea shade sto) green
126 Parks F 14.05.26 Concrete panel to caretakers ST DJ] Scale Ng Indicated Pate 03.12.25
1753 1125.00 __|47.00 STAGE 1 BOUNDARY E 14.05.26 Preliminary WD Buildings A & B for coordination ST DJ ue building | design | town planning
7154 1250.00 _ | 102.00 IMPERVIOUS AREA (84.90%) 17,134.0 sqm ‘STAGE 2 BOUNDARY Q tt toon nn response win Gul ey Badded a By Project No. 2025-68 Sheet No. 04 |6 Lorraine Avenue
1779.00 |615.00 2157.00| 720.00] 2539.00 |840.00 2498.00 [948.00 levised stages & bin locations Marcoola Beach, QLD, 4573
STAGE 3 BOUNDARY B 30.04.26 550mm setback to Bldg D Tenancies 37-47 ST DJ DA DRAWINGS Issue J | 07 5448 8500 ° ’
SUBTOTAL 2338 00 2577-00 3370-00 S600 MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND STAGE 4 BOUNDARY | [A 27.02.26 Preliminary DA Issue ST_bu - —
GROSS FLOOR AREA: Level 1 8973.00 | Mezzanine 3123.00 TOTAL: 2096.00) [ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT) STAGE 5 BOUNDARY, Issue Date Subject inital Auth | Drawing Description \www.buildingsuncoastgreen.com.au
Amendments SITE / FLOOR PLAN LEVEL 1-OPT 05 QBCC Licence No 65942
Section 7
NOTE:-
END OF TRIP FACILITIES TO BE PROVIDED IN EACH TENANCY
BUILDING D
BUILDING B BUILDING C
UP UP UP UP UP UP UP UP
PART 01
BUILDING A PART 02
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3
4 4 4 4 4 4 4 4
5 5 5 5 5 5 5 5
6 6 6 6 6 6 6 6
7 7 7 7 7 7 7 7
TENANCY 9 TENANCY 8 TENANCY 7 TENANCY 6 TENANCY 5
8 8 8 8 8 8 8 8
9 9 9 9 9 9 9 9
TENANCY 10
11
10
11 TENANCY 10
11
10
11
10
11
10
11
10
11
10
11
11 10
12 12 12 12 12 12 12 12
13 13 13 13 13 13 13 13
14 14 14 14 14 14 14 14
15 15 15 15 15 15 15 15
16 16 16 16 16 16 16 16
17 17 17 17 17 17 17 17
18 18 18 18 18 18 18 18
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
47 m2 47 m2 55 m2 55 m2 55 m2 55 m2 55 m2
03 KEY PLAN
REF REF REF REF REF REF REF REF
SHW VAN VAN SHW SHW VAN VAN SHW SHW VAN VAN SHW SHW VAN VAN SHW - LEVEL 1 Scale @ A3 1:2500
MV MV MV MV MV MV MV MV
SCREEN
SCREEN
SCREEN
SCREEN
SCREEN
SCREEN
SCREEN
SF SF SF SF SF SF SF SF
920
920
920
920
920
920
920
WC WC WC WC WC WC WC WC
STAGE LEGEND
STAGE 1 BOUNDARY
STAGE 2 BOUNDARY
01 FLOOR PLAN - BUILDING A NORTH
STAGE 3 BOUNDARY
STAGE 4 BOUNDARY
- LEVEL 1 - PART 01 Scale @ A3 1:200 STAGE 5 BOUNDARY
A
20
J
BALCONY
UP OVER 18 m2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
UP UP UP UP
1 1 1 1
2 2 2 2
3 3 3 3
4 4 4 4
5 5 5 5
J 26.08.31 DA Revision ST DJ
6 6 6 6
7 7 7 7
TENANCY 5 TENANCY 4 TENANCY 3 TENANCY 2 TENANCY 1 i 26.05.29 DA Revised civil Issue C inserted ST DJ
8 8 8 8
9 9 9 9
10
11
10
11
10
11
10
11 H 26.05.26 Revised civil Issue C inserted ST DJ
12 12 12 12
G 18.05.26 Revised Area schedule ST DJ
13
14
13
14
13
14
13
14 MEZZANINE F 14.05.26 Concrete panel to caretakers ST DJ
15
16
15
16
15
16
15
16
OVER 65 m2 E 14.05.26 Preliminary WD Buildings A & B for coordination ST DJ
D 14.05.26 RFI response with Civil Rev B added ST DJ
17 17 17 17
18 18 18 18
C 01.05.26 Revised stages & bin locations ST DJ
MEZZ. MEZZ. MEZZ. MEZZ. B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
55 m2 55 m2 63 m2 63 m2 A 27.02.26 Preliminary DA Issue ST DJ
REF REF REF REF REF
REMI RAFTER
SHW VAN VAN SHW SHW VAN VAN SHW SHW VAN
LOT 18 TAYLOR COURT
MV MV MV MV MV COOROY
SCREEN
SCREEN
SCREEN
SCREEN
SCREEN
SF SF SF SF SF
BICYCLE
920
920
920
920
920
WC WC WC WC WC
STORE
50mm SETDOWN
TO AMENITY SLAB FLOOR PLAN - BUIDING A _ LEVEL 1
A
20 ST DJ
02 FLOOR PLAN - BUILDING A As Indicated 03.12.25
- LEVEL 1 - PART 02 Scale @ A3 1:200 2025-68 05
MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT) DA DRAWINGS J
GSPublisherVersion 647.0.97.0
Section 8
NOTE:-
END OF TRIP FACILITIES TO BE PROVIDED IN EACH TENANCY
BUILDING D
BUILDING B BUILDING C
BUILDING A
PART 01 PART 02
TENANCY TENANCY 10 TENANCY 8 TENANCY 6
11 TENANCY 9 TENANCY 7 TENANCY 5
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
47 m2 47 m2 55 m2 55 m2 55 m2 55 m2 55 m2
03 KEY PLAN
- LEVEL 1 Scale @ A3 1:2500
STAGE LEGEND
STAGE 1 BOUNDARY
STAGE 2 BOUNDARY
01 FLOOR PLAN - BUILDING A NORTH
STAGE 3 BOUNDARY
STAGE 4 BOUNDARY
- LEVEL 2 - PART 01 Scale @ A3 1:200 STAGE 5 BOUNDARY
A
20
J
BALCONY
18 m2
J 26.08.31 DA Revision ST DJ
TENANCY 5 TENANCY 4 TENANCY 3 TENANCY 2 TENANCY 1 i 26.05.29 DA Revised civil Issue C inserted ST DJ
H 26.05.26 Revised civil Issue C inserted ST DJ
MEZZANINE G 18.05.26 Revised Area schedule ST DJ
65 m2 F 14.05.26 Concrete panel to caretakers ST DJ
E 14.05.26 Preliminary WD Buildings A & B for coordination ST DJ
D 14.05.26 RFI response with Civil Rev B added ST DJ
C 01.05.26 Revised stages & bin locations ST DJ
B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
A 27.02.26 Preliminary DA Issue ST DJ
MEZZ. MEZZ. MEZZ. MEZZ.
55 m2 55 m2 63 m2 63 m2
REMI RAFTER
LOT 18 TAYLOR COURT
COOROY
FLOOR PLAN - BUIDING A _ LEVEL 2
A
ST DJ
02 FLOOR PLAN - BUILDING A
20
Scale @ A3 1:200
As Indicated 03.12.25
- LEVEL 2 - PART 02
MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND 2025-68 06
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT) DA DRAWINGS J
GSPublisherVersion 647.0.97.0