Original source · versioned page text
26-08-31_Lot 2 Taylor Ct Cooroy_DA Issue J
Attached to the e-mail Request to suspend the Appeal Period & Reps - MCU26/0040 OPW26/0066 & RAL26/0013.
Original PDF page 12, section 1. The text section number identifies this passage in the reader.
C
21
TENANCY 30 TENANCY 29 TENANCY 28 TENANCY 27 TENANCY 26 TENANCY 25 TENANCY 24
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
60 m2 60 m2 60 m2 60 m2 60 m2 60 m2 60 m2
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
60 m2 60 m2 60 m2 60 m2 60 m2 60 m2 60 m2
TENANCY 17 TENANCY 18 TENANCY 19 TENANCY 20 TENANCY 21 TENANCY 22 TENANCY 23
C NORTH
21 MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT)
01 FLOOR PLAN - BUILDING C REMI RAFTER
- LEVEL 2 Scale @ A3 1:200 LOT 18 TAYLOR COURT
COOROY
J 26.08.31 DA Revision ST DJ
i 26.05.29 DA Revised civil Issue C inserted ST DJ
H 26.05.26 Revised civil Issue C inserted ST DJ
G 18.05.26 Revised Area schedule ST DJ ST DJ
ST DJ
F 14.05.26 Concrete panel to caretakers
As Indicated 03.12.25
NOTE:- E
D
14.05.26
14.05.26
Preliminary WD Buildings A & B for coordination ST
RFI response with Civil Rev B added ST
DJ
DJ
2025-68
END OF TRIP FACILITIES TO BE PROVIDED IN EACH TENANCY C 01.05.26 Revised stages & bin locations ST DJ 12
B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
A 27.02.26 Preliminary DA Issue ST DJ DA DRAWINGS J
GSPublisherVersion 647.0.97.0
FLOOR PLAN - BUIDING C _ LEVEL 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (26-08-31_Lot 2 Taylor Ct Cooroy_DA Issue J.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.