                                                                                                                                                       PREPARATION OF GARDEN BEDS FOR PLANTING                  MULCH                                                                               MAINTENANCE:
                                                                                                                                                       CULTIVATE EXISTING SOIL IN NATURAL GROUND TO A           ALL GARDENS ARE BE MULCHED WITH 'TEA TREE'                                          IT IS THE RESPONSIBILITY OF THE PROPERTY OWNER
                                                                                                                                                       MINIMUM DEPTH                                            MULCH TO A MINIMUM DEPTH OF 100mm.                                                  TO MAINTAIN THE PROPERTY TO A SATISFACTORY
                                                                                                                                                       OF 150mm. IMPORT CLEAN TOPSOIL (SANDY LOAM) TO                                                                                               STANDARD TO COUNCIL'S APPROVAL.
                                                                                                                                                       A MINIMUM DEPTH OF 300mm, ABOVE ORIGINAL                                                                                                     A MAINTENANCE REGIME MUST BE PROGRAMMED TO
                                                                                                                                                       GROUND LEVEL. ORGANIC MATTER OR GYPSUM ETC,              DRAINAGE                                                                            MAINTAIN MULCH, WATER, FERTILISER, PRUNING AND
      TREES



                                                                                                                                                       MAY ALSO BE ADDED SOIL FOR THE BEST POSSIBLE             PLEASE ENSURE ADEQUATE DRAINAGE IS INSTALLED                                        THE CARE AND/OR REPLACEMENT OF ANY DAMAGED
                                                                                                                                                       GROWTH TEST THE SOIL USING A 'SOIL TEST KIT' TO          BELOW GARDENS AND PAVED AND CONCRETED AREAS.
                                                                                                                                                                                                                                                                                                    OR DISEASED PLANT.
                                                                                                                                                       ENSURE IT IS HEALTHY AND AMEND AS NECESSARY.
                                                                                                                                                       ALL GARDEN BEDS TO BE MOUNDED 300mm MIN AT               LOCATION OF SERVICES AND LEVELS:                                                    SHORT TERM
                                                                                                                                                       CENTRE OF BED, ABOVE FINISHED PAVEMENT LEVELS,
                                                                                                                                                       TO PREVENT ANY PONDING AROUND PLANTS.                    PLEASE REFER HYDRAULICS PLAN FOR FULL                                               FOR THE FIRST 4 WEEKS ALL PLANTS MUST BE
                                                                                                                                                                                                                INFORMATION ON SERVICES TYPE AND LOCATION AND                                       WATERED FOR 20mins PER DAY min. REDUCING TO
                                                                                                                                                       FERTILISE USING A SLOW RELEASE FERTILIsER IN 'PILL'      FINISHED LEVELS.                                                                    10mins PER DAY FOR FOLLOWING 5 MONTHS, (ALWAYS
                                                                                                                                                       OR 'GRANULE' FORM, AT TIME OF PLANTING. ENSURE                                                                                               WATER IN RELATION TO RAINFALL).
                                                                                                                                                       THAT FERTILIZER DOES NOT DIRECTLY CONTACT                CONCRETE:
                                                                                                                                                       ROOTS.
                                                                                                                                                                                                                STENCILLED CONCRETE IS TO BE USED AS THE FINISH                                     LONG TERM
                                                                                                                                                       INSTALL AN AUTOMATIC IRRIGATION SYSTEM WITH              FOR THE ENTRY PATHWAY WHERE SHOWN.
                                                                                                                                                                                                                                                                                                    FERTILISE ALL PLANTS EACH SPRING & WHEN
                         Coast Banksia Integrifolia   Cupaniopsis anacardioides        Elaeocarpus reticulatus   Melaleuca Quinquenervia               TIMER. PLACE IRRIGATION LINE AFTER PLANTING &            A STENCILLED CONCRETE FINISH IN A COLOUR AND
                                                                                                                                                                                                                                                                                                    REQUIRED DURING THE YEAR. ENSURE USE OF A
                                                                                                                                                       PRIOR TO MULCHING.                                       STYLE COMPLIMENTARY TO THE BUILDING IS TO BE
                                                                                                                                                                                                                APPLIED BY A QUALIFIED PERSON ACCORDING TO BEST                                     NATIVE 'FRIENDLY' FERTILIZER.
                                                                                                                                                                                                                INDUSTRY STANDARDS.                                                                 TREES & SHRUBS TO BE PRUNED AFTER FLOWERING
                                                                                                                                                       USE ONLY SUN 'HARDENED' PLANTS. ENSURE HEALTHY                                                                                               TO MAINTAIN HEALTHY GROWTH AND SHAPE. PRUNE AT
                                                                                                                                                       ROOT SYSTEM TO ALL PLANTS TO BE USED. UNDER NO                                                                                               THE NODE FOR ALL NATIVES. NEVER 'HARD PRUNE' A
                                                                                                                                                       CIRCUMSTANCES ARE ROOT BOUND                             GENERAL NOTES:                                                                      PLANT UNLESS ON RELIABLE AUTHORITY.
                                                                                                                                                       PLANTS TO BE USED.                                                                                                                           DUE TO BREAKING DOWN, ORGANIC MULCH NEEDS TO
                                                                                                                                                                                                                CONCRETE ROLLBACK KERB FOR CAR PARK EDGES                                           BE 'TOPPED UP' EVERY FEW YEARS TO MAINTAIN A
                                                                                                                                                                                                                AND GARDEN BOUNDARIES AS NECESSARY, TO                                              THICK COVER.
                                                                                                                                                       TREES
       LARGE SHRUBS




                                                                                                                                                                                                                ENGINEER'S DETAIL.                                                                  STAKES AND WEBBING WHICH SUPPORT TREES MAY BE
                                                                                                                                                       ALL 45L TREES AND LARGE SHRUBS WILL NEED TO BE                                                                                               REMOVED AFTER TREES ARE SUITABLY ESTABLISHED.
                                                                                                                                                       STAKED SECURELY USING 1800mm STAKES x 2 OR 3 AS
                                                                                                                                                       NECESSARY AND TIED TO STAKES USING HESSIAN
                                                                                                                                                       WEBBING, (TO PREVENT PLANT DAMAGE UNTIL
                                                                                                                                                       ESTABLISHED).




                              Banksia robur                     Westringia fruticosa
                                                                                                                                                                                                                                                                                                        PLANT SCHEDULE
                                                                                                                                                                            NO:     CODE       BOTANICAL NAME                                              COMMON NAME                           HEIGHT          SPREAD     COLOUR        POT SIZE
                                                                                                                                                                            TREES
                                                                                                                                                                             47  Ban int       Banksia integrifolia                                       Costal Banksia                          5m               2m       Yellow        45 L
       SMALL SHRUBS




                                                                                                                                                                             11     Cup ana Cupaniopsis anacardioides                                     Tuckeroo                                7m               6m       Yellow        45 L
                                                                                                                                                                             34     Ela ret    Elaeocarpus reticulatus                                    Blueberry Ash                           6m               2m       White         45 L
                                                                                                                                                                             16     Mel qui    Melaleuca quinquenervia                                    Paperback                               9m               3m       Cream         25 L
                                                                                                                                                                            LARGE SHRUBS
                                                                                                                                                                             33     Ban rob Banksia robur                                                  Swamp Banksia                          2-3m             2-3m     Yellow        140mm
                                                                                                                                                                             101 Wes fru Westringia fruticosa                                             Native Rosemary                         2m             1.5m       Purple        300mm
                         Callistemon 'Little John'     Crinum pedunculatum               Syzygium 'Little Gem'                                                              SMALL SHRUBS
                                                                                                                                                                             137    Cal LJ     Callistemon 'Little John'                                  Little John                             1m               1m       Red           140mm
                                                                                                                                                                             445    Cri ped    Crinum pedunculatum                                        Swamp Lily                              1.0m           1.0m       White         140mm
                                                                                                                                                                             182    Syz LG Syzygium francisii                                             Little Gem                              2m               1.5m        -
                                                                                                                                                                                                                                                                                                                            Purple        140mm
       GROUND COVERS




                                                                                                                                                                            GROUND COVERS
                                                                                                                                                                             74     Car gla    Carpobrotus glauscens                                      Pig Face                                0.2m           0.8m       White         140mm
                                                                                                                                                                             510    Dia bre    Dianella brevipedunculata                                  Blue Flax Lily                          1m               1m                     140mm
                                                                                                                                                                             209    Hib sca Hibbertia scandens                                            Snake vine                              0.2m           2.5m       Yellow        140mm
                                                                                                                                                                             226    Tra var    Trachelospermum ‘tricolour’                                Variegated Jasmine                      0.5m           2.0m       White /Pink 140mm
                                                                                                                                                                           GRASSES & SEDGES (Bio-Retention Basin Plants)                                                                                         QTY / m2
                         Carpobrotus glauscens           Dianella brevipedunculata Hibbertia scandens                    trachelospermum ‘tricolour’                         250    Fic nod Ficnia nodosa                                                 Knobby Club-Rush                       0.5m-1.5m       8 per m2                 Tube stock
                                                                                                                                                                             250    Jun usi    Juncus usitatus                                            Common Rush                             0.3-1.2m       8 per m2     -           Tube stock
                                                                                                                                                                                                                                                                                                                                             NORTH
                                                                                                                                                                             490 Lom hys Lomandra hystrix                                                 Katie Bells                             0.5-1.0m      4 per m2      Yellow
                                                                                                                                                                                                                                                                                                                              -           Tube stock
      GRASSES / SEDGES




                                                                                                                                                                                                                                                                                        REMI RAFTER
                                                                                                                                                                                                                                                                                        LOT 18 TAYLOR COURT
                                                                                                                                                                                                                                                                                        COOROY
                                                                                                                                                                                                        J    26.08.31   DA Revision                                     ST   DJ
                                                                                                                                                                                                        i    26.05.29   DA Revised civil Issue C inserted               ST   DJ
                                                                                                                                                                                                        H    26.05.26   Revised civil Issue C inserted                  ST   DJ
                                                                                                                                                                                                        G    18.05.26   Revised Area schedule                           ST   DJ                   ST                DJ
                                                                                                                                                                                                                                                                        ST   DJ
                                                                                                                                                                                                        F
                                                                                                                                                                                                        E
                                                                                                                                                                                                             14.05.26
                                                                                                                                                                                                             14.05.26
                                                                                                                                                                                                                        Concrete panel to caretakers
                                                                                                                                                                                                                        Preliminary WD Buildings A & B for coordination ST   DJ          As Indicated         03.12.25
                                                                                                                                                                                                        D
                                                                                                                                                                                                        C
                                                                                                                                                                                                             14.05.26
                                                                                                                                                                                                             01.05.26
                                                                                                                                                                                                                        RFI response with Civil Rev B added
                                                                                                                                                                                                                        Revised stages & bin locations
                                                                                                                                                                                                                                                                        ST
                                                                                                                                                                                                                                                                        ST
                                                                                                                                                                                                                                                                             DJ
                                                                                                                                                                                                                                                                             DJ             2025-68                31
                                                                                                                                                                                                        B    30.04.26   550mm setback to Bldg D Tenancies 37 - 47       ST   DJ
                                                                                                                                                                                                        A    27.02.26   Preliminary DA Issue                            ST   DJ        DA DRAWINGS                   J
                         Lomandra hystix                           Juncus usitatus           Ficnia nodosa
GSPublisherVersion 647.0.97.0
                                                                                                                                                                                                                                                                                  LANDSCAPE SCHEDULE

Log in to download the original (26-08-31_Lot 2 Taylor Ct Cooroy_DA Issue J.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.