Original source · versioned page text
26-08-31_Lot 2 Taylor Ct Cooroy_DA Issue J
Attached to the e-mail Request to suspend the Appeal Period & Reps - MCU26/0040 OPW26/0066 & RAL26/0013.
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
NOTE:-
END OF TRIP FACILITIES TO BE PROVIDED IN EACH TENANCY
BUILDING D
BUILDING B BUILDING C
UP UP UP UP UP UP UP UP
PART 01
BUILDING A PART 02
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3
4 4 4 4 4 4 4 4
5 5 5 5 5 5 5 5
6 6 6 6 6 6 6 6
7 7 7 7 7 7 7 7
TENANCY 9 TENANCY 8 TENANCY 7 TENANCY 6 TENANCY 5
8 8 8 8 8 8 8 8
9 9 9 9 9 9 9 9
TENANCY 10
11
10
11 TENANCY 10
11
10
11
10
11
10
11
10
11
10
11
11 10
12 12 12 12 12 12 12 12
13 13 13 13 13 13 13 13
14 14 14 14 14 14 14 14
15 15 15 15 15 15 15 15
16 16 16 16 16 16 16 16
17 17 17 17 17 17 17 17
18 18 18 18 18 18 18 18
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
47 m2 47 m2 55 m2 55 m2 55 m2 55 m2 55 m2
03 KEY PLAN
REF REF REF REF REF REF REF REF
SHW VAN VAN SHW SHW VAN VAN SHW SHW VAN VAN SHW SHW VAN VAN SHW - LEVEL 1 Scale @ A3 1:2500
MV MV MV MV MV MV MV MV
SCREEN
SCREEN
SCREEN
SCREEN
SCREEN
SCREEN
SCREEN
SF SF SF SF SF SF SF SF
920
920
920
920
920
920
920
WC WC WC WC WC WC WC WC
STAGE LEGEND
STAGE 1 BOUNDARY
STAGE 2 BOUNDARY
01 FLOOR PLAN - BUILDING A NORTH
STAGE 3 BOUNDARY
STAGE 4 BOUNDARY
- LEVEL 1 - PART 01 Scale @ A3 1:200 STAGE 5 BOUNDARY
A
20
J
BALCONY
UP OVER 18 m2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
UP UP UP UP
1 1 1 1
2 2 2 2
3 3 3 3
4 4 4 4
5 5 5 5
J 26.08.31 DA Revision ST DJ
6 6 6 6
7 7 7 7
TENANCY 5 TENANCY 4 TENANCY 3 TENANCY 2 TENANCY 1 i 26.05.29 DA Revised civil Issue C inserted ST DJ
8 8 8 8
9 9 9 9
10
11
10
11
10
11
10
11 H 26.05.26 Revised civil Issue C inserted ST DJ
12 12 12 12
G 18.05.26 Revised Area schedule ST DJ
13
14
13
14
13
14
13
14 MEZZANINE F 14.05.26 Concrete panel to caretakers ST DJ
15
16
15
16
15
16
15
16
OVER 65 m2 E 14.05.26 Preliminary WD Buildings A & B for coordination ST DJ
D 14.05.26 RFI response with Civil Rev B added ST DJ
17 17 17 17
18 18 18 18
C 01.05.26 Revised stages & bin locations ST DJ
MEZZ. MEZZ. MEZZ. MEZZ. B 30.04.26 550mm setback to Bldg D Tenancies 37 - 47 ST DJ
55 m2 55 m2 63 m2 63 m2 A 27.02.26 Preliminary DA Issue ST DJ
REF REF REF REF REF
REMI RAFTER
SHW VAN VAN SHW SHW VAN VAN SHW SHW VAN
LOT 18 TAYLOR COURT
MV MV MV MV MV COOROY
SCREEN
SCREEN
SCREEN
SCREEN
SCREEN
SF SF SF SF SF
BICYCLE
920
920
920
920
920
WC WC WC WC WC
STORE
50mm SETDOWN
TO AMENITY SLAB FLOOR PLAN - BUIDING A _ LEVEL 1
A
20 ST DJ
02 FLOOR PLAN - BUILDING A As Indicated 03.12.25
- LEVEL 1 - PART 02 Scale @ A3 1:200 2025-68 05
MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT) DA DRAWINGS J
GSPublisherVersion 647.0.97.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (26-08-31_Lot 2 Taylor Ct Cooroy_DA Issue J.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.