Decision Notice - Change to an Existing Approval - 010.2003.00220729.004 [As Published] · 132003.220729.4
2003/220729
20. The carparking area shall be designed to comply with the provisions of AS 2890.1-1993 for
user class 1 except the minimum head clearance (headroom) at any point shall be 2.3m.
Stormwater Drainage
21. All stormwater drainage shall be collected and discharged on site with an overflow pipe
connected to Councils existing stormwater system in Park Road. The design shall incorporate
some means of reducing the head of the discharge prior to entry to Council’s system. In this
regard, plans shall be prepared by a Registered Professional Civil Engineer and submitted to
Council prior to obtaining a Development Permit for Operational Works.
22. All site stormwater drainage shall be by means of a gravity systems.
Sewer Mains
23. The development site shall be connected to the Council’s existing sewer manhole
(NH01/33/03) located outside the southwest corner of the property.
24. The sewer connection to the site shall be in accordance with Council’s standards and
requirements at no cost to Council. The applicant is advised that a Compliance Permit for all
plumbing and drainage works within the boundaries of the development site shall be obtained
from Council’s Plumbing Services Section prior to obtaining a Development Permit for Building
Works.
Town Water Supply
25. The site shall be connected to Council’s existing town water supply in Allambi Rise and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
26. Each water connection to the water reticulation system shall extend to the property boundary
and be metered.
Geotechnical Issues/Construction
27. All construction works on site shall accord with the Geotechnical Reports prepared by Golder
Associates dated July 2003 and Morrison Geotchnic dated 23 November 2006 and
subsequent reports specific to the amended design (including the pool), subject to
amendments to address condition No. 43, with cut and fill for retaining walls not to exceed a
maximum depth of 1.5 metres.
The applicant’s geotechnical engineer is required to be on site for the whole of the time during
any excavation and house foundations including the construction of the retaining walls and the
footing for the falsework. Such work shall only be carried out during dry weather conditions.
The geotechnical engineer shall also inspect the site periodically throughout the construction
of the dwelling and certify the stability of the structure upon its completion. Should any risk of
sand movement occur - all work shall be suspended until steps (approved by the Geotechnical
engineer) have been taken to ensure that no further slippage will result.
28. The disposal of sand, soil or any materials created by the construction of the dwellings shall
be removed in accordance with the Construction Management Plan. Details of the method of
this disposal of materials are to be submitted to Council at the Building Application stage. Not
more than one vehicle at a particular time will be parked in Park Road for the removal of, or
the delivery of, materials associated with the site and no such vehicle shall remain overnight.
No materials are permitted to be stored within the road reserve.
Page 4 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2003.00220729.004 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 71 KB (small file)
- File type
No other editions are linked here.