29. A programme of works is to be submitted with any application for any Development Permit for
Operational Works detailing the construction schedule and proposed environmental protection
measures, including a vegetation management plan, which addresses stabilisation of
disturbed areas.
Where the program is changed for any reason whatsoever, a copy of the revised program
shall be submitted to Council’s Works Inspector within seven (7) days.
30. A Traffic Management Plan for the Construction of the Dwelling addressing the access to the
site, the locating of equipment, carparking arrangements for workers on the site and any
potential conflicts with local traffic shall be submitted to Council for approval prior to works
commencing on site.
31. Prior to the issue of Building Permit the builder shall submit written acknowledgment that
building works shall proceed in accordance with the 9 tonne load limit applicable to Park Road,
unless varied by Council.
32. At the completion of construction the consulting geotechnical engineer will certify that all works
were carried out in accordance with their recommendations and that the structures and the site
are stable.
33. A Condition Survey is to be carried out on adjoining buildings, structures and services prior to
any construction works taking place on site. If distress already exists, a photographic survey
shall be undertaken, the distress measured and a plan to monitor changes to distress shall be
implemented. A copy of this report is to be submitted to Council within 5 business days of
survey and prior to construction work proceeding.
34. The use of vibratory equipment of any kind is not permitted to be used, including vibrating
rollers, the use of vibrating installation techniques for sheet piling and other construction
vibrations caused by excavating, earthmoving or demolition machinery or other similar
construction techniques.
Erosion and Sediment Control
35. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Vegetation Protection
36. Vehicular pavements within the drip zone of any of the existing trees on site to be retained
shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
allow water that falls on this surface to penetrate to the trees root system. The pavement shall
be constructed so as not to damage the tree or their root system and in this regard temporary
fencing shall be provided around the trees during construction to help protect them.
Plans shall be submitted to the Council for approval that clearly show the type and extent of
the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
Operational Works.
Page 5 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2003.00220729.004 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 71 KB (small file)
- File type
No other editions are linked here.