43.8 The applicant’s Geotechnical engineer will be required to be on site for the whole of
the time during any excavation. The construction of the whole of the foundations
and retaining walls is to be supervised and directed on site by a consulting
Geotechnical engineer. No work of any such kind relating to the foundations shall
be carried out if he is not on the site and supervising and directing this work. Such
works shall only be carried out during dry weather conditions and if there is a risk of
sand movement occurring, all work shall be suspended until such steps, approved
by the applicant’s Geotechnical engineer and the Council’s Building Surveyor, have
been taken to ensure that no further slippage will result.
43.9 Survey marks should be established on the structure to monitor the construction and
surrounds for movement. Monitoring for any potential movement shall be carried out
at regular intervals of a maximum length time of three (3) months for at least the first
year from the use commencing. The monitoring results shall be assessed by a
geotechnical engineer and may be scaled down or stoped depending on the results
and subject to the geotechnical engineer recommendations.
Additional Condition 29/03/07
44. The sewer connection shall be undertaken in accordance with an approved Arborist’s report
and the following requirements:
44.1 The route for the service trench shall be a minimum of 1.5 metres clear of all trees
and shrubs, unless otherwise agreed to by the Manager, Land Use.
44.2 An arborist shall be on site all times supervising the works being undertaken.
44.3 Prior to commencing any works, the route for the service trench shall be pegged and
inspected by Manager, Land Use.
44.4 Prior to excavation existing mulch/leaf cover material over proposed trench shall be
raked back and stockpiled for covering of trench area after completion.
44.5 Works shall be undertaken in a progressive manner and route reinstated as works
progress.
44.6 Uphill anchor roots of trees shall not be disturbed.
44.7 All works shall be carried out by hand excavation other then the sewer trench under
existing road pavement.
44.8 All excavated material shall be placed on a ‘tarpaulin’ or the like laid immediately
adjacent to the proposed trench.
44.9 Excavated material shall be used as bedding and backfilling of trench.
44.10 Where works disturb the understorey vegetation, rehabilitation works shall be
undertaken to the reasonable satisfaction of Manager, Land Use.
RECONFIGURE A LOT CONDITIONS
1. For the purpose of these conditions, the following definitions apply: -
A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by
Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
2. Pursuant to Section 3.5.21(5) of the Integrated Planning Act 1997, the currency period is two
(2) years from the day this permit takes effect during which time all conditions must have been
complied with and the Plan of Survey lodged with the Council for endorsement.
3. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
documentation shall be presented to Council and shall be submitted in the correct form with
the fees prescribed in Council's adopted fee schedule.
Page 7 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2003.00220729.004 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 71 KB (small file)
- File type
No other editions are linked here.