Roadworks Contributions
37. A roadworks contribution of $2,524 towards the Coastal Major Road Network in accordance
with Planning Scheme Policy PSP42, shall be paid to the Council prior to obtaining a
Development Permit for Operational Works. This amount will be subject to variations in the
Price Index, All Groups Brisbane from March 2004 until the date of payment.
Pathway Contributions
38. A pathway contribution of $246 towards external major pathways, in accordance with Planning
Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior
to obtaining a Development Permit for Operational Works. This amount will be subject to
variations in the Price Index, All Groups Brisbane from March 2004 until the date of payment.
General
39. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
40. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
41. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Building
42. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum building height of 9 metres above natural surface.
43. All building works shall be in accordance with the Geotechnical reports prepared by Golder
Associates dated July 2003 and Morrison Geotchnic dated 23 November 2006 subject to the
following conditions:-
43.1 An amended Geotechnical Report addressing the design amendments associated
with this approval shall be submitted to Council for its information prior to the
application for Operational Works;
43.2 There is to be no uncontrolled discharge of water onto the slope;
43.3 Stripping of vegetation for construction purposes should be minimised. If vegetation
is destroyed it should be reinstated immediately after construction is completed;
43.4 Additional load due to fill, construction equipment or stockpiled materials should not
be located on the dune slope;
43.5 The use of vibratory equipment of any kind is not permitted to be used, including
vibrating rollers, the use of vibrating installation techniques for sheet piling and other
construction vibrations caused by excavating, earthmoving or demolition machinery
or other similar construction techniques;
43.6 The construction management plan is to be adhered to;
43.7 Copies of all inspection reports by engineers are to be submitted to Council within 5
business days of the inspection taking place;
Page 6 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2003.00220729.004 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 71 KB (small file)
- File type
No other editions are linked here.