Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2020-05-12 Services & Organisation Committee Agenda

of 119

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                   12 MAY 2020


   Pomona Asphalt Resurfacing.
     Works commenced on asphalt resurfacing at the Pomona waste transfer station due to water
     ingress into the asphalt surface and base materials in early November 2019. These works
     were undertaken under the current contract 1718T021: Road Resurfacing and Rehabilitation
     was awarded to “All Roads”. The works included profiling failed sections of the asphalt hard
     stand and deep lift on the internal intersection. All asphalt resurfacing and internal
     linemarking were completed by the end of November 2019.




Capital Works – Improved Roadworks

   Master Planning Eumundi Rd Landfill
     ATC Williams (Consultant) commenced work on a Master Plan for the Eumundi Rd Landfill
     to guide the future development of the site and provide details on future stages of
     development. This report will guide the Capital Works Program for the 2020/21 year.

   Design of Outbound Weighbridge Eumundi Rd
     A late project was approved during the year to design a new outbound weighbridge at the
     landfill to facilitate construction in 2020/21. This project was moved forward due to serious
     congestion and safety issues where traffic was banking up onto Eumundi Road, while
     commercial vehicles used the inbound weighbridge to tare off after disposing of their load.

   Construction Of A Revised Waste Storage Area For Bins In Hastings Street.
     The current storage areas for public place bins awaiting servicing along Hastings Street
     needed replacement and a new storage area for bin collection by Cleanaway is being
     constructed in the latter part of 2019/20.




                                                                                  Page 47 of 119
Log in to download the original file

2020-05-12 Services & Organisation Committee Agenda(PDF, 12MB).pdf · 12.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.