Original source · versioned page text
2020-05-12 Services & Organisation Committee Agenda
The original of this document is very large (12.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 12 MAY 2020
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
expenses that that were not incurred
during the shutdown. Overall, the
NAC is net $84k ahead of YTD
budget.
Noosa Aquatic Centre – major capital Major maintenance works completed Coordinate installation of new heat Finalise upgrade or replacement of
works including replacement of deck and pump for 50m pool. the main switchboard prior to
roof, as well as tile and grout works Develop and release invitation to connection of the new solar panels
in the 50m and Leisure pools. Cost quote for the replacement light pole Complete replacement of the light
escalations were kept to a minimum footings. pole footings and subsequently shift
and no major defects have occurred light poles and install new LED
since reopening. lights.
Install of remaining 72kW of solar
panels complete (system now totals
100kW).
Noosa Aquatic Centre – general Patronage numbers have largely Coordinate the redeployment of staff Preparation for scaled re-
recovered to normal levels following during the COVID19 closure period. instatement of NAC and activities
the closure over winter. Where possible, attempt to provide post COVID-19.
Implementation of marketing plan to staff with continuity of employment Continue to support staff via
continue to boost patronage and and assist our community in a redeployment opportunities.
counter the effects of St Andrew’s variety of ways. Determine the best paths forward for
opening their pool and learn to swim Record and release instructional the café and junior squad coaching
school. videos to help our community stay leases, both expiring 30 June 2020.
Upskilling of new staff over peak active and connected to our facilities Continue to review ways to reduce
summer period. during the closure. the centre’s emissions in addition to
Implement communications plan the solar install; will work with a
with patrons and key user groups to consultant to get the most efficient
maintain contact during COVID-19 use of the centre’s plant and
period. equipment.
Determine scope and required Commence work on the masterplan
resources for the completion of the and LTS strategy.
10-year NAC masterplan and the
Learn to Swim (LTS) program
strategy.
Page 66 of 119
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.