Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2020-05-12 Services & Organisation Committee Agenda

of 119

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                              12 MAY 2020


BRANCH ACTIVITIES                       RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                         THE NEXT QUARTER
                                           Stage 1 parking review Little Cove,         improvements and O-Boats retaining        including sport and recreation plan, 3
                                             Noosa Heads is complete.                    wall.                                     TMR CNLGG corridor analysis for
                                                                                      Providing ongoing design support for:      Tewantin to Noosa Heads, Noosa
                                                                                        o two emergent slip repair projects        Heads to Marcus Beach, Marcus
                                                                                           at Sunshine Beach,                      Beach to Shire Boundary, Precinct
                                                                                        o Noosaville Waste Transfer Station        planning for Noosa Drive and Noosa
                                                                                        o Tewantin Bypass - Beckman’s              Heads Precinct.
                                                                                           Road                                  Finalisation of tender documents for
                                                                                        o Walking and Cycling Strategy             Doonella Bridge renewal, Kin Kin
                                                                                           including sport and recreation          Wahpunga Lane Bridge renewal,
                                                                                           plan                                    Tablelands Road B Bridge renewal,
                                                                                        o 3 TMR CNLGG corridor analysis            Peregian Beach Boardwalk, Project
                                                                                           for Tewantin to Noosa Heads,            Avenue stormwater upgrade and
                                                                                           Noosa Heads to Marcus Beach,            Sea Eagle Drive safety
                                                                                           Marcus Beach to Shire Boundary          improvements.
                                                                                        o Noosa District Sports complex          Delivery of Doonella Bridge, Orealla
                                                                                        o Precinct planning for Noosa Drive        Crescent Bridge, Kin Kin Wahpunga
                                                                                           and Noosa Heads.                        Lane Bridge and Cooran tableland
                                                                                                                                   Road B Bridge renewal, Black
                                                                                      Delivery of Black Mountain Road
                                                                                                                                   Mountain Road upgrade, Gympie
                                                                                        upgrade, Gympie Terrace
                                                                                                                                   Terrace Stormwater improvements
                                                                                        Stormwater improvements and
                                                                                                                                   and corridor upgrade Hilton Terrace
                                                                                        corridor upgrade Hilton Terrace
                                                                                                                                   roundabout and corridor upgrade.
                                                                                        roundabout, corridor upgrade and
                                                                                        Orealla Crescent Bridge replacement.
Transport Strategy
Plan the implementation of the key         Development of the school                  Evaluate and engage with schools         Roll out schools activities (COVID-
transport strategies in the Noosa            evaluation tool                            Draft car parking management plan.         19 dependent)
Transport Strategy 2017-2027.
                                           Car parking data collection                                                           Workshop with Council on Car
                                                                                                                                     parking management
                                                                                                                                   Workshop with Council on Transport
                                                                                                                                     Strategy Financial Model
Implement approved actions from the        Completion of the second ‘Go               Evaluation of the Peak Period            Plan for improvements additional
Noosa Transport Strategy 2017-2027           Noosa’ Peak Period Traffic                   Traffic Management initiatives used        features for future peak period
that encourage the use of alternative        Management Plan including new                at Xmas 2019/20.                           initiatives including option for
transport and reduce community               initiatives of a Noosa Styled Shuttle                                                   shuttle between Noosa Spit and
dependence on private motor vehicles.        Bus loop                                                                                National Park



                                                                                           Page 85 of 119
Log in to download the original file

2020-05-12 Services & Organisation Committee Agenda(PDF, 12MB).pdf · 12.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.