GENERAL COMMITTEE MEETING                                                                       17 MARCH 2025


8.5     FINANCIAL PERFORMANCE REPORT – FEBRUARY 2025


Author                Financial Services Manager, Pauline Coles
                      Financial Services | Corporate Services Department
Index                 ECM/ Subject / 22.09 – Monthly Financial Performance Report
Attachments           1.   Attachment 1 Statement of Income and Expenditure - Feb 2025
                      2.   Attachment 2 Statement of Financial Position - Feb 2025
                      3.   Attachment 3 Statement of Cashflows - Feb 2025
                      4.   Attachment 4 Key Materials & Services Expenditure - Feb 2025


EXECUTIVE SUMMARY
Year-to-date (YTD) performance against current budget as at 28 February 2025 is positive with
operating revenues outperforming forecast and operating expenditure under forecast YTD.

Capital revenues are above forecast with capital expenditure behind of forecast due to delays
and rescheduled timing of project delivery.
   YTD Financial Performance Summary
                                           Budget         Actual     Variance       Variance
                                                                                                    Status
                                              $m             $m           $m              %
   Operating Revenue                        $125.6        $127.9           $2.3        1.8%        On Track
   Operating Expense                         $89.0         $88.8           $0.1        0.1%        On Track
   Operating Position                        $36.6         $39.0           $2.4
   Capital Revenue                           $39.0         $47.6          $8.6         22.1%      On Track
   Capital Expenditure*                      $88.8         $56.5         $32.3         36.4%    Behind Budget

* Reflects constructed assets and intangibles only (excludes contributed assets).


The $2.4 million full year positive interim operating variance comprises $1.7 million general
operating surplus from activities that are funded through Council’s general rate, regulatory fees
and sales of goods and services; as well an additional $0.5 million from waste operations and
$0.2 million from holiday park operations and $0.1 million from unspent levy and separate charge
funds, which are constrained in reserve for future use where they are not fully utilised in a given
year.

                                                                                  Budget       Actual   Variance
 Item                                                                               YTD          YTD         YTD
                                                                                     $m           $m          $m
 General business operating position (unconstrained funds)                         $25.3        $27.0        $1.7
 Commercial operations (constrained funds) *                                        $8.5         $9.1        $0.6
 Unspent levies (constrained funds)                                                 $2.8         $2.9        $0.1
 Total Council Operating Position                                                  $36.6        $39.0        $2.4
* Includes Waste and Holiday Park operations as shown in the table below
Log in to download the original file

FINANCIAL PERFORMANCE REPORT.pdf · 657 KB (small file)

Full text of the other 10 pages

Page 2

GENERAL COMMITTEE MEETING                                                           17 MARCH 2025


Council elects to apply National Competition Policy (NCP) reforms to its Waste Management and
Holiday Parks which provides greater transparency and assists with removing anti-competitive
conduct and ensures the best allocation of Council's limited resources. A summary of the YTD
operational performance of these business activities are outlined below.

                                          Waste Operations                   Holiday Parks
                                      Budget  Actual Variance          Budget   Actual Variance
                                        YTD      YTD       YTD           YTD      YTD       YTD
                                         $m       $m        $m            $m       $m        $m
 Revenue                                22.9     23.2       0.3           3.0      3.2       0.2
 Expenditure                            14.9     14.7       0.2           2.5      2.5       0.0
 Net Operating Position                  8.0      8.5       0.5           0.5      0.7       0.2

Financial statements including Statement of Income & Expenditure, Statement of Financial Position
(balance sheet), and Statement of Cash Flows are included as attachments for information for
Council.

Figure 1: Actual Performance Compared to Budget




Council’s performance against key measures of financial sustainability has been calculated as at
February 2025. These statutory indicators enable the reader to assess Council’s success in
managing its budget, cash and debt as well as undertaking sustainable asset management. The
table below contains a snapshot of a number of key measures, with full detail included in the report.


 YTD Measures of Financial Sustainability
                                                         Current
                                             Target                   Actual YTD        Status
                                                         Budget
 Operating Surplus Ratio                      0-10%       -0.1%          30.5%        On Track
 Net Financial Liabilities Ratio              <60%        -7.0%         -49.0%        On Track
 Cash Cover Ratio                           3 months   9.5 months     14.1 months     On Track
 Asset Sustainability Ratio                   > 90%      116.6%          51.7%      Behind Budget




RECOMMENDATION
That Council note the report by the Financial Services Manager to the General Committee
Meeting dated 17 March 2025 outlining the February 2025 year to date financial performance
against budget, including changes to the financial performance report with the inclusion of key
financial sustainability indicators.

Page 3

GENERAL COMMITTEE MEETING                                                              17 MARCH 2025


REPORT


Operating Revenue (YTD Benchmark 66.7%)
Council has received 90.5% ($127.8 million) of its operating revenue budget ($141.3 million).
Commentary on each revenue category is provided below.

 Category          Summary                   Comments
 Rates and         $94.5 million (100.2%)       •   Waste utility charges $268.2k above YTD budget
 Levies            of the annual budget of          (101.5% or $17.3 million of $17.0 million annual
                   $94.3 million has been           budget earned)
                   earned                       •   General rate (net of discounts) $64.9k below
                                                    YTD budget (99.9% or $71.1 million of $71.2
                                                    million annual budget earned)

 Fees and          $7.3 million (67.0%) of      •   Building & Plumbing Compliance $85.9k above
 Charges           the annual budget of             budget (68.1% or $1.8 million of $2.6 million
                   $10.9 million has been           annual budget earned)
                   earned                       •   Waste $59.3k above budget (153.1% or $87.2k
                                                    of $56.9k annual budget earned)
                                                •   Development Assessment $443.3k below
                                                    budget (60.1% or $2.1 million of $3.6 million
                                                    annual budget earned)

 Sale of Goods     $11.2 million (70.2%)        •   Sports facility revenue $230.9k above budget
 and Services      of the annual budget of          (76.3% or $2.3 million of $2.9 million annual
                   $15.9 million has been           budget earned)
                   earned                       •   Holiday Park revenue $114.4k above budget
                                                    (73.5% or $3.2 million of $4.3 million annual
                                                    budget earned). Any revenue upside will be
                                                    generally offset by a corresponding increase in
                                                    associated operating costs.

 Interest          $4.4 million (118.0%)        •   Interest revenues have continued to track above
 Received          of the $3.7 million              budget with investment in higher yielding term
                   annual budget has                deposits maximising the return on surplus cash
                   been earned                      holdings. Cash holdings remain high due to the
                                                    advanced payment of grants & subsidies,
                                                    restricted levy balances, future provision
                                                    balances and delays in the delivery of the capital
                                                    works program.
 Other Revenue     $2.6 million (82.0%) of      •   Plant recharge revenue is $89.6k above budget
                   the $3.2 million                 due to internal plant being utilised for the delivery
                   annual budget has                of disaster funded capital projects.
                   been earned                  •   Lease revenue $100.4k above budget (77.1% or
                                                    $1.7 million of $2.2 million annual budget earned)
                                                •   Recoupment of Utility charges on commercial
                                                    properties $22.6k above budget (143.9% or
                                                    $73.6k of $51.1k annual budget earned.

 Operating         $4.7 million (65.5%) of      •   Operating Grants and subsidies are in line with
 Grants,           the $7.1 million                 budget expectations at this stage of the year.
 Subsidies         annual budget has            •   $1.4 million of the FY 2025 financial assistance
                   been received                    grant allocation was received in July 2024. This
                                                    is a change from the previous approach of

Page 4

GENERAL COMMITTEE MEETING                                                                17 MARCH 2025


 Category           Summary                 Comments
                                                  prepaying part or all of the grant in the preceding
                                                  year. This prepayment approach had been
                                                  consistent over the past 7 years.
                                               • Council has received notification of the approved
                                                  FY 2024/25 financial assistance grant allocation
                                                  which is less than budgeted. As such there is
                                                  potential for this to impact the FY 24/25 operating
                                                  position if payment of future years allocations are
                                                  not paid in the preceding year.

 Unitywater         On track                       •    Unitywater distributions are fixed each year so
 Distributions                                          there is limited budget variance risk

Figure 2: Operating Revenue Position by Type (Excluding Rates)




Operating Expenditure (YTD Benchmark 66.7%)
Actual operating expenditure is currently 62.9% ($88.8 million) of the full year budget ($141.1
million). Detailed commentary for each expenditure category is provided below.

 Category           Summary                            Comments
 Employee Costs     $33.3 million (62.7%) of the          •   Expenditure for permanent staff salaries
                    annual budget of $53.1                    and wages underspent ($1.1 million) due to
                    million has been expended                 position vacancies and recoupment of YTD
                                                              vacancy dividend. This underspend is
                                                              offset by additional spend on casual staff
                                                              and external labour hire ($1.1 million).
                                                          •   Training costs are ahead of forecast at this
                                                              point in the year (82.4% or $276.5k of
                                                              $386.1k annual budget spent)
 Materials and      $39.4 million (62.7%) of the          •   Civil Operations $430.6k above budget
 Services           $62.8 million annual budget               (70.3% or $6.7 million of $9.5 million annual
                    has been expended.                        budget spent)
                                                          •   Holiday Parks $108.8k above budget
                                                              (71.3% or $1.8 million of $2.6 million annual
                                                              budget spent) offset by additional revenue
                                                          •   Disaster Management $70.5k above budget
                                                              (115.8% or $120.5k of $104.0k annual
                                                              budget spent)
                                                          •   Transport levy $92.2k above YTD budget
                                                              (45.9% or $442.2k of $962.0k annual
                                                              budget spent) – timing issue only, unspent
                                                              levy funds are held in reserve for future use.

Page 5

GENERAL COMMITTEE MEETING                                                              17 MARCH 2025


 Category           Summary                        Comments
                                                         •   Streetlighting $106.4k above budget (75.6%
                                                             or $833.5k of $1.1 million annual budget
                                                             spent)
                                                         •   Waste Management $171.3k below budget
                                                             (60.8% or $9.0 million of $14.8 million
                                                             annual budget spent)
                                                         •   Arts & Culture $153.3k below budget
                                                             (55.5% or $1.4 million of $2.6 million annual
                                                             budget spent)
                                                         •   Canals and Waterways $101.1k below YTD
                                                             forecast budget (41.4% or $143.6k of
                                                             $346.2k annual budget spent)
                                                         •   Development Assessment $99.0k below
                                                             budget (69.8% or $916.5k of a $1.3 million
                                                             annual budget spent)
                                                         •   Buildings and Facilities $74.5k below
                                                             budget (54.0% or $666.8k of a $1.2 million
                                                             annual budget spent)
                                                         •   Sports & Active lifestyles $62.4k below
                                                             budget (60.8% or $1.0 million of a $1.6
                                                             million annual budget spent)

 Finance Costs      Currently on track                   •   Whilst existing loan borrowings are set with
                                                             fixed interest rates, any further RBA rate
                                                             rises will impact finance costs on new loan
                                                             borrowings. YTD underspend also relates
                                                             to the timing of drawdown of forecast
                                                             borrowings for FY 2025.
 Depreciation       Currently on track             Nil
 Other Expenses     Currently on track             Nil

Figure 3: Operating Expenditure Position by Type




Tourism and Economic Development Investment Summary
Council resolved to report on a monthly basis, investment details for tourism and economic
development. Tourism and economic development activity is funded through the general rates
revenue. Expenditure at 28 February 2025 is outlined below:

Page 6

GENERAL COMMITTEE MEETING                                                               17 MARCH 2025


 Expenditure                                             YTD Budget        YTD Actual        Variance
                                                              $’000             $’000           $’000
 Tourism Noosa Funding Agreement                             $2,520.0          $2,520.0             -

 Economic Development                                          $729.8              $706.7       $23.1

 Total                                                       $3,249.8          $3,226.7         $23.1

All instalments payable under the Tourism Noosa agreement for the 2024-25 financial year have
been made. The Tourism Noosa agreement is due for renewal in June 2025.
   •     Employee Costs are $24.3k below budget (59.3% or $388.4k of $654.6k annual budget
         spent)
   •     Materials & Services are in line with budget at this stage of the year.

Capital Revenue
Year to date Capital revenue of $47.6 million received comprises cash contributions from
developers ($1.0m) and capital grants ($46.5 million). Note that the timing of capital grant
receipts are generally dependent on the timing of grant conditions and also capital delivery
performance, and that the timing of the receipt of developer contributions (both cash and
contributed) is unpredictable.

Grants and subsidies are higher than prior years due to the receipt of funding from the
Queensland Reconstruction Authority for reconstruction works relating to the Black Mountain
landslip and several other flood impacted sites, which are currently under construction.
Figure 6: Capital Revenue by Type




Capital Program
Actual capital expenditure (excluding commitments and disaster projects) is $18.1 million (YTD
budget $30.2 million). Expenditure on disaster projects (excluding commitments) is $38.4 million
(YTD budget $58.6 million).

Detailed discussion of progress in the delivery of the capital works program is provided through
a separate quarterly report by the infrastructure team.

Page 7

GENERAL COMMITTEE MEETING                                                           17 MARCH 2025



Figure 7: Capital Program Delivery Performance




Cash Management and Investment Performance
Total cash on hand at the end of February was $135.6 million. Included in this balance are funds
held in trust and for restricted purposes (e.g. unexpended levy and grant funds), prepaid grants
including the financial assistance grant, QRA disaster funding and other capital works grants,
prepayment of Waste Levy subsidy (3 years), and unspent monies committed for funding capital
projects which are underway and will continue during the financial year.
The following pie charts present the mix of cash held at February 2025 by agency (graph on the
left) and by credit risk rating (graph on the right). All funds have been invested in accordance
with the Investment Policy and in consideration of the principles of ethical investment,
preservation of capital, return on investment and counterparty thresholds.

Figure 8: Closing Cash Held by Agency and Credit Rating




The following chart monitors the 12 month trend on total cash and the agencies invested. To
maximise the return on in its cash holdings Council has invested $30.5 million in higher yielding term
deposits. These investments were made in line with Council’s Investment of Surplus Funds policy.

Page 8

GENERAL COMMITTEE MEETING                                                          17 MARCH 2025



Figure 9: 12 Month Trend of Cash Invested by Agency




Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no significant emerging risks regarding
performance identified at this stage, however the delay in the delivery of the capital program
may impact Council’s asset sustainability and renewal targets.
 Category                                                 Comments
 Operating Surplus Ratio                                  •   Intent: Identifies the extent to which
                                                              revenues cover operational expenses,
                                                              to ensure community equity is not
                                                              degraded
                                                          •   Target: Greater than 0%.
                                                          •   Result: 30.5%
                                                          •   Comment: The ratio is at the second
                                                              peak for the year following the issue of
                                                              rates in January. This ratio will slowly
                                                              decline as expenditure on operations
                                                              occurs through to the end of the
                                                              financial year at 30 June 2025.

 Cash Expense Cover                                       •   Intent: Indicates how long council can
                                                              continue paying its day-to-day
                                                              expenses from cash at bank without
                                                              needing additional cash flows
                                                          •   Target: > 3 months
                                                          •   Result: 14.1 months
                                                          •   Comment: Council is forecast to
                                                              remain above target for the financial
                                                              year. Business as usual expenditure
                                                              through to 30 June 2025 will continue
                                                              to diminish Council’s cash holdings,
                                                              albeit not below the target range of 3 –
                                                              6 months.
                                                              Cash balances are at the peak of the
                                                              cycle with the second rates issue

Page 9

GENERAL COMMITTEE MEETING                                  17 MARCH 2025


Category                          Comments
                                     occurring in January 2025.Cash
                                     reserves also include working capital
                                     requirements and funding for capital
                                     programs, unspent grant monies paid
                                     in advance, Waste Levy subsidy
                                     prepayments and QRA advance
                                     payments for disaster projects which
                                     are restricted for specific purposes and
                                     inflate the ratio.

Asset Sustainability Ratio        •   Intent: Measures the extent to which
                                      assets are being replaced as their
                                      condition degrades to ensure service
                                      potential is maintained.
                                  •   Target: 80% of depreciation budget
                                      spent on renewals annually.
                                  •   Result: 51.7% achieved, however
                                      below forecast result due to project
                                      delays and scheduling.
                                  •   Comment: The ratio will progressively
                                      increases each month as expenditure
                                      on renewals occurs as part of the
                                      capital     works     program.      For
                                      transparency QRA disaster projects
                                      have been excluded from the ratio
                                      calculations. Should capital works
                                      continue to fall below forecast for the
                                      remainder of the year this may impact
                                      the achievement of Council’s asset
                                      sustainability and renewal targets

Net Financial Liabilities Ratio   •   Intent: Outlines the level that net
                                      Council debt can be serviced by
                                      operating revenues. A ratio below zero
                                      implies that liabilities are less than
                                      cash (and other current assets) and
                                      there is adequate borrowing capacity
                                      available if needed.
                                  •   Target: less than 60%
                                  •   Result: -49.0%
                                  •   Comment: Council has low debt
                                      levels and strong cash holdings. The
                                      advance payment of rates, grants and
                                      subsidies also inflates the YTD actual
                                      outcome.

Investment Return                 •   Intent: Ensure appropriate return on
                                      investment yield for cash at bank.
                                  •   Target: 0.25%        above      current
                                      Bloomberg commonwealth 10-year
                                      bond rate yield (4.47%)
                                  •   Result: 4.38%
                                  •   Comment: With cash reserves at
                                      the peak of the cycle, with the
                                      second bi-annual rates issue in
                                      January, the calculated rolling
                                      return is showing slightly below
                                      target. As cash reserves are

Page 10

GENERAL COMMITTEE MEETING                                                                17 MARCH 2025


    Category                                                    Comments
                                                                    utilised through to 30 June 2025,
                                                                    investment return will return to
                                                                    target range.

    Rates in Arrears                                            •   Intent: Ensuring that the amount of
                                                                    unpaid rates remains sustainable and
                                                                    does not negatively impact cash flows
                                                                •   Target: 5% industry benchmark
                                                                •   Result: 10.7%
                                                                •   Comment: Rates arrears are at its bi-
                                                                    annual peak following the due date for
                                                                    the January rates issue. This ratio will
                                                                    continue to decline from the high point
                                                                    in the cycle as payments are received.
                                                                    Recovery action may be considered
                                                                    where appropriate.


Link to Corporate Plan

Theme No. 5. - Excellence
This theme focuses on customer experience, financial sustainability, innovation and technology,
levels of service, governance, our employees and volunteers, funding streams and asset
management practices.
Objective 5.2 - Continue to deliver a financially sustainable Council that has the resources now and
into the future to achieve its strategic objectives. This will be supported through the introduction of
enhanced sustainability reporting and performance indicators, as well as ESG (environment social
and governance) accounting practices as guided by statutory requirements.


Previous Council Consideration
Nil

Finance
As above

Risk & Opportunities
Council’s risk register identifies a number of risks that could impact on its ongoing financial
sustainability. In order to manage and mitigate these risks Council uses various tools which include
monthly ongoing financial reporting to identify and address emerging issues, conservative budgeting,
compliance with the Financial Sustainability Policy, regular budget reviews, effective liquidity
management to ensure sufficient fiscal flexibility, as well as adhering to the Reserves and Restricted
Cash policy which requires that Council maintains both a disaster management reserve and a
minimum 3 months cash cover to fund emergent matters.
Some examples of potential risks that may impact on Council’s operational performance, capital
program delivery, cashflow and cash reserves include:
•     Substantial damage to or failure of Council infrastructure due to natural disaster or other
      emergent issue that may require significant unplanned investment;
•     An extended closure of Council facilities impacting operational revenues;
•     A prolonged IT system failure affecting Council’s ability to deliver services or issue rates notices;

Page 11

GENERAL COMMITTEE MEETING                                                                    17 MARCH 2025


•       Economic conditions affecting ratepayers’ ability to pay rates;
•       Market driven increases in construction and operational costs significantly above estimates;
•       Labour and material shortages and delays.
•       Strategies, plans and projects deliverables that have not been accurately costed

Human Rights
Human Rights Compatibility Statement
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in a
manner that is compatible with human rights. This report should be read in conjunction with Council’s
Human Rights Policy.

Consultation
External Consultation - Community & Stakeholder
Nil


Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.
Departments consulted:
        Office of the CEO, Mayor &               Community Services               Corporate Services
                Councillors
         Mayor & Councillors               X   Director                    X   Director
    X    Chief Executive Officer               Community Development       X   Financial Services
         Executive Officers                    Sport & Active Lifestyles       Fleet
         Community Engagement                  Arts & Culture                  Revenue Services
         People & Culture                      Community Connection            ICT
         Governance                            Customer Experience             Procurement

                                                                               Commercial Property

         Strategy & Environment                Development & Regulation        Infrastructure Services
    X    Director                          X   Director                    X   Director
         Strategic Land Use Planning           Development Assessment          Infrastructure Planning, Design
                                                                               and Delivery
         Economic Development          &       Local Laws                      Civil and Asset operations
         Destination Management
         Environmental Services                Environmental Health            Waste
         Innovation & Digital Hub              Building & Plumbing             Building & Facilities
                                               Property / Permits              Disaster Management

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.