Council archive · source document
Part 2 of 37 Noosa on Weyba Town Planning Assessment Report MCU12/0208
Very large file (35.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
This level is required to ensure no works are undertaken on Erosion Prone Land and based
on the reporting undertaken it is concluded that the proposal will have no adverse impacts
in relation to Erosion and Sediment Control.
In order to mitigate any adverse effects of landslide hazards during construction, Noosa on
Weyba will conduct ongoing maintenance and management through the body corporate
including an on-site an assessment of the post-development landslide levels as provided in
the State Planning Policy 1/03 Guideline -
Mitigating the Adverse Impacts of Flood, Bushfire
and Landslide.
99
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 2 of 37 Noosa on Weyba Town Planning Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 35.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.