8.2.11 landslide hazard and steep land overlay code



Overall outcomes


(2)The overall outcomes sought for the landslide hazard and steep land overlay code are the
following:-

(a) development in areas at risk from landslide hazard is compatible with the nature of the
hazard;


(b)the risk to people, property and the natural environment from landslide hazard is minimised;

(c) development does not result in a material increase in the extent or severity of landslide
hazard;


(d)development on steep land occurs only where the scenic and environmental quality and
integrity of the landscape is maintained and safe and efficient access can be provided.


Attached within Appendix 3 Cardno have undertaken a detailed Engineering Assessment of the bulk
earthworks, road works, stormwater drainage and servicing for the proposed         Noosa   on   Weyba
Preliminary Approval Development, with extensive consideration given to environmental protection.
The report made the      following conclusions in regard to the sites suitability for the proposed
development in regard to erosion and sediment control:
          .   The development footprint is generally located within the existing cleared areas and

              therefore minimal additional clearing will be required.
          .   Due to the ecologically sensitive location of the site, appropriate storm water quality
              treatment is  of the upmost importance. The proposed WSUD strategy for the site
              includes community education, large rainwater tanks, bio-retention
                                                                            basins, vegetated
              swales and litter baskets;
          .   The flood study indicates there are no adverse impacts on flood levels and flows for

              surrounding properties for local and regional flood events. Flood attenuation is
              proposed through controlled culverts and detention basins at various locations. All
              development areas have sufficient flood immunity in accordance with SCRC
              requirements;
          .   Earthworks areas have been minimised to limit the impact on the existing vegetation
          .   Excavation is generally   confined to existing road reserves, proposed roads and the
              development footprint.
          .   Preliminary bulk earthworks modelling indicates that a balance cut to fill can be
              achieved, which could potential reduce impact on the surrounding community and
              Council roads;
          .   The development provides an improved flood access for neighbouring properties and a
              reduction in the 100 year ARt event the         peak flood level around Lake Entrance
              Boulevard;


          In addition to ensuring compliance with Council’s Erosion and Sediment Control Code an

          assessment against the Queensland Coastal Plan was required establish if earthworks could

          occur in areas outlined within the Noosa on   Weyba locality Plan.

          Further to meetings with and correspondence provided to the Department of Environment
          and Heritage protection it was accepted that the highest astronomical tide (HAT)within lake

          Weyba is approximately O.23mAHD and that the use of this level of HAT can be supported.
                                                                                                    98

Used in these records

About this file

File size
35.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 2 of 37 Noosa on Weyba Town Planning Assessment Report MCU12_0208.pdf · 35.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.