Part 2 of 37 Noosa on Weyba Town Planning Assessment Report MCU12/0208
Very large file (35.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
. The most effective solution from a traffic and transport perspective, appears to be
providing full connectivity to Walter Hay Drive. Importantly, this connection will
facilitate a contemporary planning outcome maximising accessibility, sharing of
traffic loads and providing opportunities to expand public transport services to
existing and new developments.
. Current planning practice and policies detail a public transport coverage target to
ensure that 90% are located within 400m of a public transport service. This principal
has been at the forefront of developing a precinct layout and local street network
plan for the Noosa on Weyba site. Given the location of an existing bus route on
Walter Hay Drive, the recommended strategy for the provision of public transport to
Noosa on Weyba is to provide an opportunity for this route to divert through the
eastern portion of the development and then south towards Eumarella Road and
Weyba Downs.
. A network of pedestrian and cycle routes are proposed within the development
allowing access to key activity nodes including the lake, rental precinct and external
pedestrian/cycle infrastructure.
Cardno have also provided a detailed assessment of a Stormwater Management Plan for the Noosa
on Weyba Development with the following recommendations;
Due to the ecologically sensitive location of the site, appropriate stormwater quality treatment is of
the upmost importance. For this reason the best available stormwater treatment measures have
been proposed. The proposed WSUD strategy for the site includes:
.
Community education.
. Reducing potable water demand through use of water efficient devices and
appliances
.
Large rainwater tanks (around twice the QDC size requirements) connected to all
practically available roof area to maximise rainwater harvesting, reduce stormwater
flows and reduce potable water demand.
. Bio-retention basins.
. Bio-retention gardens within the road reserve.
. Bio-retention tree pits within the road reserve.
. Bio-retention swales.
. Vegetated swales.
. Litter baskets.
Buffer areas.
.
Revegetation and rehabilitation of Lake Weyba buffer area.
. Rehabilitation of Keyser Creek waterway corridor.
. Reticulated water and sewerage, which will minimise the risk of contaminants from
effluent being discharged into Lake Weyba.
The proposed development will maximise the use of alternative sources of water. The proposed
rainwater tanks will be able to provide around 82 percent of the non-potable water demand and
around 53percent of the total water demand of the site.
MUSIC modelling has shown that the water quality objectives and frequent flow objectives for the
site can be met. The reduction in pollutant loads being achieved by the proposed storm water
treatment train is significantly greater than the reduction typically provided by standard residential
developments. The resultant pollutant loads from developed areas of the site are less than those
resulting from the existing rural use of these areas. Other areas of the site will be converted from
rural uses to park areas and densely vegetated areas will become designated conservation areas, and
55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 2 of 37 Noosa on Weyba Town Planning Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 35.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.