Water Supply & Sewerage Reticulation Code


Attached within Appendix 5 Cardno have prepared a Water Supply and Sewerage Report to satisfy
the requirements of the Water Supply and Sewerage Reticulation Code based on an assessment of
the Noosa on Weyba Preliminary Approval Development.


The report made the     following conclusions in regard to the sites suitability for the proposed
development in regard sewerage and water networks.
          .    A sewerage network analysis has been undertaken and determined the development

               can be accommodated with     external augmentation to Pump Station NVLOll and the
               Noosa STP. Currently the Noosa STP is scheduled to be upgraded in December 2015.

               The assessment indicates connection to the existing network is possible to the north

               of the development;
          .    A   conventional gravity   sewer   network is   proposed     to service the   development.
               Several pump stations are required to convey to the flow to the existing network
               connection points. Alternative servicing strategies such as the use of low pressure

               sewers have been    considered for this development. It is envisaged that subsequent

               development applications may result in alternative servicing strategies;
          .    A   water    network   analysis    has   been   undertaken    and   determined    that   no

               augmentation of the existing network is required to accommodate the development.
               Connection to the existing network is possible to the north         of the development. A
               network     of trunk mains and smaller mains is required internally           to maintain

               Unitywater’s DSS within the development
          .    The   development is outside       the current water   supply    and sewerage     planning
               headworks region and is proposed to connect to the existing water supply and

               sewerage networks currently servicing Noosa.
          .    To provide water supply to the development it is proposed to connect to the Noosa

               Industrial DMA (NIDMA)and serviced via the Tewantin Reservoirs.
          .    Analysis undertaken by MWH on behalf of Unitywater indicated that the current
               NIDMA water supply network has sufficient capacity to accommodate the

               development.
          .    To service the site, a connection to the existing 600mm diameter trunk main along

               Eenie Creek Road via a 250 mm diameter main along Walter hay Drive is proposed.
          .    Consideration should be given to a connection to the existing 150 mm reticulation
               main in Lake Entrance Boulevard to avoid dead end mains in the proposed network.

          .    An internal network of 200 mm and 150 mm diameter water mains will be required

               to service each site to maintain Unitywater’s DSS.

          .    The conveyance of sewage from the site is proposed via the internal use of pump
               stations and local reticulation mains. For the purposes of this study a conventional

               system has been identified, as per Unitywater’s DSS.
          .    A Low pressure sewerage system may be considered depending on topography site

               constraints and capacity at the Noosa STP. It is expected that the design flow with a
               low pressure system will be reduced by at least 50%,should this system be adopted.
          .    A total offive pump stations are proposed. Four internal pumps will convey flow to a

               central pump station to the north of the development.


Based on the above assessment and conclusions it is considered that the proposal complies with the

requirements of the Water Supply and Sewerage reticulation Code.

                                                                                                        57

Used in these records

About this file

File size
35.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 2 of 37 Noosa on Weyba Town Planning Assessment Report MCU12_0208.pdf · 35.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.