Water Supply & Sewerage Reticulation Code
Attached within Appendix 5 Cardno have prepared a Water Supply and Sewerage Report to satisfy
the requirements of the Water Supply and Sewerage Reticulation Code based on an assessment of
the Noosa on Weyba Preliminary Approval Development.
The report made the following conclusions in regard to the sites suitability for the proposed
development in regard sewerage and water networks.
. A sewerage network analysis has been undertaken and determined the development
can be accommodated with external augmentation to Pump Station NVLOll and the
Noosa STP. Currently the Noosa STP is scheduled to be upgraded in December 2015.
The assessment indicates connection to the existing network is possible to the north
of the development;
. A conventional gravity sewer network is proposed to service the development.
Several pump stations are required to convey to the flow to the existing network
connection points. Alternative servicing strategies such as the use of low pressure
sewers have been considered for this development. It is envisaged that subsequent
development applications may result in alternative servicing strategies;
. A water network analysis has been undertaken and determined that no
augmentation of the existing network is required to accommodate the development.
Connection to the existing network is possible to the north of the development. A
network of trunk mains and smaller mains is required internally to maintain
Unitywater’s DSS within the development
. The development is outside the current water supply and sewerage planning
headworks region and is proposed to connect to the existing water supply and
sewerage networks currently servicing Noosa.
. To provide water supply to the development it is proposed to connect to the Noosa
Industrial DMA (NIDMA)and serviced via the Tewantin Reservoirs.
. Analysis undertaken by MWH on behalf of Unitywater indicated that the current
NIDMA water supply network has sufficient capacity to accommodate the
development.
. To service the site, a connection to the existing 600mm diameter trunk main along
Eenie Creek Road via a 250 mm diameter main along Walter hay Drive is proposed.
. Consideration should be given to a connection to the existing 150 mm reticulation
main in Lake Entrance Boulevard to avoid dead end mains in the proposed network.
. An internal network of 200 mm and 150 mm diameter water mains will be required
to service each site to maintain Unitywater’s DSS.
. The conveyance of sewage from the site is proposed via the internal use of pump
stations and local reticulation mains. For the purposes of this study a conventional
system has been identified, as per Unitywater’s DSS.
. A Low pressure sewerage system may be considered depending on topography site
constraints and capacity at the Noosa STP. It is expected that the design flow with a
low pressure system will be reduced by at least 50%,should this system be adopted.
. A total offive pump stations are proposed. Four internal pumps will convey flow to a
central pump station to the north of the development.
Based on the above assessment and conclusions it is considered that the proposal complies with the
requirements of the Water Supply and Sewerage reticulation Code.
57
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 2 of 37 Noosa on Weyba Town Planning Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 35.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.