2018-08-13 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 30 of 48
an Grants External oy Tat) AG feline General Total
Funds Reserves Reserves REL
SealedRoads Network Total ssCi«dS HAS A815 |S 544,71
StormwaterDrainage CCC TCO
Renewal of various stormwater stuctures across the shire —=S~*~“~*~*~“‘~*~*~*~‘“‘“‘~*~*~*~‘~*~*~SC“‘“‘“‘*dSCSC*dSCSC*‘“‘*‘“‘*dSTSSC~*dSCSCSCS*dSSC«S BB | S748
(Grosvenor Terrace Drainage Improvement Works SSSSOSC~SSSTSCSdSSSCSCSC*dSSSSSCSCSC~*dSSSC*dC +S 87,000 § 67,000
StormwaterDrainage Total = s—“‘*‘s*s*s‘“‘*S*S*S*S*S~<“s*é‘“~*s‘“‘“‘*‘s*™SSSCSC‘“‘CSSCSCNSC“(RNSCSCOC‘“(N’SNNNSNNNNNNN. | $444,988 | $141,988
StreetscapesandRoadCoridorsSs—“—~*~*s‘“‘“‘—*~*s*s*s*s*~‘“‘“~*S*S*S*sésSC“‘“CCLNCC*dCC(“C(NNCNNYNNC NNS—“idrSC Cd
[Noosa Heads Hastings Street CCTV SystemRenewalSSSS~—~—~—SS HHH S|SSC*dSSSSC*dSSSSC*dS (|S _188,000
Streetscapes andRoad Corridors Total =——Ss=~<“*s*s‘“‘*~“‘“‘“‘*;*™*™S™*S™S™S~*S*S«CNBHOOSSCC“‘“;*‘“‘CSNC*NCSON#CN”C#C#(S;SCOC*é‘ SSCS; ~«*N856,000
Transport and Infrastructure Management SSS“ CSC CSCSdSC NT
[Sunshine Beach Bicentennial Carpark and School Safe ST program(TIDS)———SSSSSCS~<~*~dSC | |SC*dYSCSCSC*dSC*C“‘“‘WLS~~#7@<B75‘(S 194,000,
Shire Forward Planning & Design Program Construction ready designs. —SSSS~*~S~*~S~sYSSCSCSCSC*dSSSCSCS*dSCSCS*SdCTSCSCSC*dSCTS +S 800,000 | $500,000 |
Pomona, Station Road Car Parking and Safety Improvements SSSSSCSCS~—SCSSSCSCSSSC*dSSCSCS~*dSCSSC‘“‘CSC*STNC*#dCCON‘C#dSS' SCA4207-|'S 114,287"
‘Tewantin Hon Terrace & Ernest Steet intersection Upgrade Construction —=SS*~*~dSC*COWOO|S*|SSSCdSSSSC*dYSCSCSCSC*«dS~«HWHO| S 7,105,210 |
(Castaways Beach, David Low Way Safety & Corridor improvements SSSSSCS~<“—~*~*~~~~SSSCSCSC*dSSSSCSSSSCSC~dSCSCSC‘“‘*dSSCSC*dCS'~=«54,000'[ $254,000
‘Sunshine Beach Pacific Avenue Pathway, Pedestrian & Drainage Improvements —=SSSS~SCSC“‘“‘“*dSSCSCSC~*idSSCSCSC~C~‘dCSCS*@dCSSSS*dSS «980,000 | $180,000 |
TTewantin, Poinciana Avenue & Moorindil Steet intersection SSSSSC~—CSSSCSCSCSC‘“‘“RSSCSC“‘(S#NNC‘#NTCC‘dYCNCN(N IS. _28,801 S23,
Ben Lexen Drive Sunshine Beach School Drop Offand Pickup Zone SSSSCS~—SCS~sYSSSSSSC*dYSSSCS~*dYSS~dSC‘“RCSC*«dSS’SC~=«*SCBS |S *5 BT
Transport and Infrastructure Management Total ——Ss=~=<“*~*é‘*‘~*~*s*~‘“‘*~*~S:*C«CADBSSS*~=‘itCS*~‘“‘*‘sSCS*SS:«Ci« TO; BBS (8G, TA |
WasteManagement S—SsSSC‘“CsSsSsSsSCSYSCSCdSC*dCUN(C(N SN. Ws
[Noosavile Eumundi Road Landfil Concept Design and Geotechnical investigation LandfilCel23——«| S| SS*YSSSS*dYSSSSCdSSS*dS 97,000 8 97,000,
Noosaville Eumundi Road Landfil Provision of Bidim Fabric AT4 to Sections 3 and ofLanafilCel22 | ——+«|—~—~S*dY~SSS~idSSSSS*dYSS «dS 10,000 | $10,000
[Noosavile Eumundi Road Landfil Recyciabies Sales Shed and EducationRoom ——SSSSSSiTSSSCS~*wSCSC“‘“‘(CLCL.C |S 67,000|$ 67,000,
WasteManagementTotal —si‘“‘C™SCS™*™*™*™*™C*sSOCSC‘(SNNSC“C(NNNNNNNNNNNN | | 144,000/ $114,000
libraries &Galleries OOOOCOCOCOCSSN“ NTO
(Cooroy Library Air Conditioner PlantRoomEnclsureSSSSC~S~—~—~—~SCSCS~SCSYSTSC‘“‘“;*SSCSCSC*‘CSC“‘(NNCdSTW_Y | 820,000, $20,000
Noosaville Library Weather Protection Shelterto Entrance SSSSCSC~—~—CSCSSSCSSSSCSSSCSC*dSCSCSCSCSCS~*dSSCSCSC*SSCSCSSS*SS 85,000 $95,000.
Noosaville Library Refurbishment Construction Year? —=SSS*~“~*~*~*~‘“‘—*~*~*~*~*~‘—*~‘“‘—*~*~*~*~*~s~s~‘—s~s~s~SS BBS ~SCd|SS*S*~*~‘tS*‘“‘RTSC#CS:~«C«C38,0902~ § 586,964
libraries Galleries Total =—s—s—“‘*S*™*™~™~C~C*dSC«CABSBBSsS*=<“‘;‘(RSS*é‘(S:#SCO#CSSS:«C«@O3;«OOO'/S ~«GAT,OGA |
Pathways &Boardwalks OS—S—SSSSOSC‘CSCst‘SC“‘(#$RNNSCTS CCST
Whole of Shire - Noosa Pedestrian and Cycle Data Counters SSSCS~—~—~—“‘“~“~‘“‘~*~*~*~*~*~sSC‘tBSC|SSSSC*dYSCSCSC*~dSC*‘“‘(CSS”~#(§ORODS 78,105
Noosa Heads Noosa Parade Road Corridor Upgrade-Design —=—=SSSS~—~—S~—~—S**—~—~—~—~—sSSSC*‘“‘(SLTCTCCdTSTSTSTTTSC*dSCSC‘(CSLWCC*C(S’~S~«SY6,T09['S$ 16,709"
Noosa Heads, Park Road Boardwalk Construction —=SSS~=~“~*~*~‘“‘~‘~*~*~*~*~*~‘“‘“‘~*~*S*S*S*S*S*~<“~*~*~*sé‘*SC“‘“CSNSCLC*YTC*dSC*~‘“WSNC#C#$N’ YS 66,820 |S _—66,820 |
Pathway renewal at Gympie Terrace SSSSCSCS~“~S~“~sS*CSC~S~—CSsSSSYSSSSSCSC~*dSSSSCSSSSC*dSS*dSCSd S85 S85 OB
Noosa Heads Park Road Boardwak Renewal Constucton——SSCS~SCSSCSSSSSSSCSSSCSCSC~‘iLTC“‘(N’N CL 8. 5,489,000 | $5,121,000
[Noosa Heads Main Beach Trunk Pathway Upgrade Link from Surf Club to Park Road (@0m)——=SSS*YSSCS*~‘“S*C‘“‘(CSWOWCC#*CTC_*«(S 949,057 [$349,057
(Cooroy Maple Street Raised PedestrianCrossng SS SSC*~=“~*‘s*~*‘“‘“‘*CS*S*S™S™S™S™SC™C*SC“‘(SNNCCUTCLC*iS—SdCSCSCSC*dS~«75;000 $75,000 |
Jacaranda Park, Tewantin-Pathway Renewal SSOSCS~SOSSCCCCSYSSC~dYSSCSSSC*dSC*dC «dS 88,601 $98,607
Pathways &Boardwaks Total = SS—~<“~*s*s‘“‘“~*~“‘“~*‘~*~*~*~*~*~s~‘~s~*~*~*~*~sSC‘“ |BBSSSCSCC“‘(C‘C#¥*S«S,766,903:»/$ (5,003,816,
Cc
Peregian Beach Public Amenities Renewal Construction —=—SOS~—SsS~—SsS~SC—CSsSSSSSCCSSCS*C“‘(L.TCdST LS _877,094 [$977,009 |
Public Amenities Total eg a7 09 577,091
Other Capital $ 430,500 $ 1,125,000 $ 3,818,663 $ 5,374,163
Page 30 of 48See the original
The page text is free to read. Viewing or downloading an original file needs an account.