2018-08-13 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 31 of 48
ean Grants External Loans Levy olin General Total
AssetManagemett Funds Ta TS Rates
Shire CCTV Drainage program SSOSC—SSSCSCSCSCSCSCSCSSSSC*dSSCdSSCSd i$ 200,000 $200,000
Technology One Asset Systems Mobility Rollout andHardware SYS «YS 150,000 | $150,000
Zero Emissions priority minorprojects—SOSOSOSOSSOSCSSCTC~dSSSSSCSC~dYSCC*dS 8802 | S802 |
Zero Emissions Noosa Project Implementation SSCS~—“—sSCSSS = |C*dYSCCSC~‘“LSC*‘“‘(CSSCCS««O34,25'[ $634,215,
Shire Pavement Management System Road Surface Condition Modeling SS|CSSSCdYSCSSCSCSSCSCSC~C~‘“RTCSC‘“C‘“WN(NWWCCS’ 40,000 | $ 40,000
Tewantin Administration Building AirHandling Unitreplaceme SSSS~—~S~SYSSSSSCS~SCSC~‘YSCtCS~*dYSCSCSCSC*dSSSSC*dS «BOD S500,
AssetManagementTotal = ssi‘“‘s*S*S*S™S*™*™CO™C™C™C™C™C™CS CSS 4080597 | $1,050,517
Fleet-PlantReplacement sC—‘“‘“~*s*s‘“‘“‘CSLSCSC(UNCNCOOCOC*dLCC(C*LSOUTCCdCN’N(N§NNNNENNCC “$a (“Cs
Council Fleet and PlantReplacement Program SSSCS~—CSCS~SS SAHOO SC|SSCdCSSCSC*«dSC*C(‘C*dS:««88;BTB| $1,998,878.
Fleet-PlantReplacementTotal —ss—~—<“~*~*s*s‘“‘*s*s‘“‘“~*S*~*~*S~*~S~SSSC«‘SSOOSSC“‘(;S*S*”SSCSSCSC*‘(TSOC#déS«#«N#OG,878/$ 1,998,878 |
Information Technology —S—SSCiaLCSC“C(NN SUNN SSN NN. | OTOL
Technology One Ci Anywhere Systems Implementation - Property and Rating ProcuretoPay | || *dYSSC*dYSCSSSCdS POTTS AOSTA
ICT Hardware -Network Switch Replacement SS—™~—OCCCCCdSSSCSC~CSSCSCSC~‘“‘iLTCSCSC*dSSCC'S 870,000 | $ 370,000
Information Technology Total OOOO 88,87 |S 848,971 |
PlanningScheme OS SS—C—SSSC“‘CS*s*‘“S™S™S™SCSC‘(NNNCSC‘(NNSNNOCOC(#NNNNNSNSNNWOLO
Noosa River Bathymetry Survey SSCSC~—C—CSCSCSCSCSCSYSCSCSSCSC*dSC‘“‘(SN CS 6OOOD CdS CSRS SHCA
Shire Project Team Resources for NewPlanning Scheme SSSSC~“~*S*~‘“‘—~*~*~*~*~‘~*SsSC“‘(‘CS3*‘LCS 676000 S| SSS] SSSSCSC«dS 676,000.
Shire Planning Scheme Consultancy SSOSCSC—SSSSSCSCSCSCSSSCdSC«dS HOO || «dS 24,000
Shire Planning Scheme Climate Change Adaptation SSSCSC*~<“~*~‘“‘~‘~*~*~*~S«CATSOO| «SOOO | | SC*dS 7G |S 979,824 |
NoosaRiver Hydraulic Model SSOSCSC—SSSCSCSCSCCdCdC*dYSSSC*idSCSSCdS 89S 34,970,
Shire Project Team Materials & Services SSOS~—SSSOSOSOCCCCCOCSSSSSSC~*dYSCSSCSC~C~«dS:«CSWOODT || SSSS«*dS «125,000
Planning Scheme Total gts go 5 4125,000) 4108 | $1,476,997 |
Grand Total $ 3,375,316 $ 4,875,000 $ 22,990,439 $31,240,755
Page 31 of 48See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.