b. The document ‘Proposed Cartwright Village Extension – Carramar, Noosa Care
Integrated Water Management Plan Version 0’ by Callaghan & Toth dated 12
February 2018.
c. The document ‘Noosa Care Inc Cartwright Village Extension Carramar, Cooroy
Noosa Road, Tewantin Preliminary Design of Stormwater Detention Volume’ by
BSM dated 21 December 2017.
d. The document ‘Flood Study Noosa Care – Carramar’ by Cardno dated 24 July
2017.
e. The Addendum Letter by Cardno (document number WE17064) dated 23
March 2018.
f. The Technical Memorandum by Cardno (ref WE17064_Carramar_TM01) dated
13 July 2018.
g. A minimum Finished Floor Level (FFL) of the Aged Care Facility and any
associated facilities at 8.80m AHD.
h. A minimum Finished Floor Level (FFL) of the Independent Living Units of 8.80m
AHD.
i. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines are to be adhered to.
Prior to the issue of a Development Permit for Material Change of Use these reports
must be amended to reflect the amended development proposal as required by
Condition 2.
Drainage Easement
27. An easement for drainage purposes must be registered against the titles of the
properties in favour of Council over the land area identified as being below the post
development 1% AEP flood level on the subject site from flooding sources external to
the site (excluding proposed structures). The easement width must be in accordance
with Noosa Council’s DDPSP. The easement must be granted at no cost to Noosa
Council. The wording of the easement documentation must be in accordance with
Council’s Standard Easement document.
28. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
Acid Sulfate Soils
29. As the site is located below the 20m AHD and above the 5m AHD, any excavation
works consisting of 100m3 or greater which extends below 5m AHD will need to be
carried out in accordance with the State Planning Policy and the Noosa Plan. In this
regard appropriate testing and supporting documentation prepared by a suitably
qualified specialist must be submitted to Council for approval prior to obtaining a
Development Permit for Operational Works.
Erosion and Sediment Control
30. Any waters discharging from the construction areas of the site to below the AEP 1%
contour must achieve less than 50mg/L Total Suspended Solids (TSS)and pH
suitable for the needs of the receiving wetland during all rain events.
Page 6 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.