GENERAL COMMITTEE MEETING AGENDA                                              13 AUGUST 2018


         Earthworks
   17.   Earthworks required on site must be carried out in accordance with Council’s
         Planning Scheme Policy PSP5 – Engineering Design Standards, so as not to cause
         the additional ponding of water on any adjoining lands or the blockage of, or
         interference with, any natural watercourses.
         General
   18.   A suitably qualified Registered Professional Engineer must prepare engineering
         drawings and specifications for all engineering works that will become Council
         infrastructure, which must be submitted in conjunction with an application for a
         Development Permit for Operational Works. In this regard a DXF/DWG file on
         GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
         with any application for Operational Works.
   19.   Digital detailed designs including drawings, calculations, specifications and a
         schedule of works, must be submitted with any application for a Development Permit
         for Operational Works in respect of roadworks and stormwater drainage works. The
         design must be in accordance with Council’s Planning Scheme Policy PSP05 –
         Engineering Design Standards – Roads, Drainage and Earthworks. To avoid conflict
         with underground pipes or services, all existing and proposed services required by
         the development must be shown on the plans.
   20.   To facilitate production of As Constructed drawings it is suggested that all design
         drawings are submitted in the Asset Design and As Constructed (ADAC) digital
         format. (Guidelines on the use of ADAC are available at www.adac.com.au).
   21.   A construction management plan/strategy to ensure no damage occurs to Council
         services must be prepared by a suitably qualified Registered Professional Engineer
         and submitted to Council in conjunction with any application for Operational Works.
   22.   Any damage caused to any public utility during the course of construction must be
         repaired to Council’s standards and at no cost to Council.
   23.   Any alteration of any public utility or other facilities necessitated by the development
         of the land or associated construction works external to the site must be at no cost to
         Council.
   24.   The transportation of all materials to and from the site must be undertaken in a
         manner such that no particle matter escapes onto a public road. All vehicles carrying
         materials either to or from the site must be covered to prevent materials including
         dust being windblown from the vehicle.
   25.   As Constructed drawings and data must be certified by a qualified experienced Civil
         Engineer for design intent, and a Licensed Surveyor must certify the cadastre and the
         location, level and type of all services and structures. All of which must be submitted
         to Council for checking and for Council’s records.
         The data must fully detail levels for all engineering works including but not limited to
         drainage structures, finished ground levels and pavement surface levels. The data
         must be submitted in the Asset Design and As Constructed (ADAC) digital format.
         (Guidelines on the use of ADAC are available at www.adac.com.au).
         Approval of works must not be granted until all As Constructed information has been
         supplied and accepted by Council.
         Stormwater
   26.   All works must be constructed and work procedures undertaken in accordance with:
         a.    The approved plans, the approved amended plans and the conditions detailed
               in this Decision Notice.


                                                                                   Page 5 of 48
Log in to download the original file

2018-08-13 General Committee Agenda(PDF, 7MB).pdf · 7.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.