Original source · versioned page text
2018-08-13 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 13 AUGUST 2018
c. Provide details of the methods to be used during the vegetation clearing
including the use of licensed spotter/catchers, disposal of cleared vegetation,
methods to ensure retained vegetation is protected from development works, in
particular where works are proposed adjacent to root zones of vegetation
located on the road reserve with reference to AS 4390 -2009 and amendments
Protection of Trees on Development Sites
d. Provide details of the treatment of environmental and declared weeds on the
site.
33. Existing trees on the site and within road reserves are to be retained, except where
required to be removed due to building operations or the conduct of the approved
use.
34. The open space and setback areas are to be landscaped in accordance with
Council’s Policy on Landscaping Guidelines and a properly prepared landscape plan
prepared by a suitably qualified Landscape Architect or Horticulturalist. Such
landscaping is to be completed prior to the premises being occupied and maintained
at all times thereafter.
35. Any building under-croft areas must be adequately stabilised for erosion control.
Dedication of Land as Reserve
36. Prior to obtaining a Development Permit for Operational Works the land area
identified as occurring at or below the 1 in 100 ARI (Q100) and to the east of the
existing car park footprint must be dedicated to Council in fee simple on trust for the
purpose of an Environmental Park.
The land to be dedicated is “non-trunk infrastructure” for the purposes of the Planning
Act 2016.
37. The land area to be dedicated must by unencumbered by services such as pump
stations, services easements or similar operational uses.
Works within Protected Land
38. The following works must be undertaken within the land to be dedicated to the Crown
as reserve, and upstream to the Noosa Cooroy Road asphalt formation:
a. Management and control of all environmental weeds, defined as “undesirable
species” in Council’s Planning Scheme Policy 3 Landscaping Plants and
Guidelines for a minimum period of 24 months.
b. Removal of any waste materials foreign to the area.
c. Treatment of any tree hazards identified through a Council approved arborist
report
The works must be undertaken in accordance with an Operational Works approval.
Fencing to Protected Land
39. A permanent fence must be constructed along the interface of the development site
with the land area to be dedicated. The fence must be constructed in accordance with
an Operational Works approval and must be to the following specifications:
a. 1.8 metres high
b. Durable Chainwire
c. Educational Signage for wetlands protection
Page 8 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.