Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2018-08-13 General Committee Agenda

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                13 AUGUST 2018


     40.   An Environmental Awareness and Education Brochure must be prepared and
           provided to personnel who manage the development. The brochure must provide
           educational information regarding the significance of the Swamp Crayfish, Melaleuca
           wetland and the potential negative impacts that may result from management
           activities such as the disposal of green wastes, bushfire management and
           stormwater management.
           ENVIRONMENTAL HEALTH
           Waste Management
     41.   The developer must provide waste storage and disposal facilities in accordance with
           Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
           and Industrial Premises”. The facilities must include an external impervious area
           correctly sized for all refuse and recycling containers and suitably screened from
           public places and neighbouring properties. A bin wash area is required with a cold-
           water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain
           outlet must be designed to prevent storm water entry to the sewerage system. This
           can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max
           0.5m²), or alternatively the waste area can be roofed, or any other design approved
           by Council.
     42.   Refuse containers must be provided in accordance with the requirements of the
           Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
           Regulation 2000, for the storage and collection of refuse.
     43.   Public bins must be provided to reduce littering. All bins provided must be for refuse
           and recycling and be decanted into the bulk bins by the site operators.
           Mechanical Equipment
     44.   Written certification is required from a suitably qualified person confirming that sound
           pressure levels from all mechanical plant and equipment comply with the following:
           a.    Air-conditioning and Refrigeration
                  7am to 10pm: Maximum background + 5dB(A)
                  10pm to 7am: Maximum background + 3dB(A)
           b.    Pumps
                  7am to 7pm: Maximum background + 5dB(A)
                  7pm to 10pm: Maximum background + 3dB(A)
                  10pm to 7am: No audible noise.
     45.   The certification must be submitted to Council, which certifies that operational noise
           from any fixed plant and equipment complies with the requirements of this Decision
           Notice.
B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.




                                                                                     Page 9 of 48
Log in to download the original file

2018-08-13 General Committee Agenda(PDF, 7MB).pdf · 7.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.