1909-13367 SRA RA6-N Response with conditions
Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.
1909-13367 SRA
6. Bus route interference: The existing urban bus route 631 extending along Myall Street
must be able to function during the construction of the development and any associated
roadworks. Accordingly, if any temporary arrangements are required, the applicant must
reach agreement on suitable arrangements with the Department of Transport and Mains’
TransLink Division ([email protected]) prior to any construction or
works commencing.
7. Road works approval: Under section 33 of the Transport Infrastructure Act 1994, written
approval is required from the Department of Transport and Main Roads to carry out road
works on a state-controlled road. Please contact the Department of Transport and Main
Roads’ on [email protected] to make an application for road works
approval. This approval must be obtained prior to commencing any works on the state-
controlled road reserve. The approval process may require the approval of engineering
designs of the proposed works, certified by a Registered Professional Engineer of
Queensland (RPEQ). Please contact the Department of Transport and Main Roads’ as soon
as possible to ensure that gaining approval does not delay construction.
8. Public utility works and connection approval: The applicant is advised that if any
works and/or connections are required to public utility services within a State-controlled
road reserve, approval must be given by the Department of Transport and Main Roads
under the relevant public utility legislation (electricity, water/sewer, telecommunication),
and in accordance with TMR technical standards (TN163). Approvals must be obtained
prior to commencing any utility works within the state-controlled road reserve. Please
contact the public utility team via [email protected] for further information on
the application and approval process.
9. Ancillary works and encroachments: In accordance with section 50(2) and schedule 6 of
the Transport Infrastructure Act 1994 (TIA) and part 5 and schedule 1 of the Transport
Infrastructure (State-Controlled Roads) Regulation 2006, written approval is required to
carry out ancillary works and encroachments on a state-controlled road. These development
conditions do not constitute such an approval. You will need to contact the Department of
Transport and Main Roads on 5451 7055 or at [email protected] to make
an application for a Road Corridor Permit under section 50(2) of the TIA to carry out
ancillary works and encroachments. Ancillary works and encroachments include but are not
limited to advertising signs or other advertising devices, paths or bikeways,
buildings/shelters, vegetation clearing, landscaping and planting.
Further information is available online at:
www.tmr.qld.gov.au/Community-and-environment/Planning-and-development/Other-
matters-requiring-approval/Road-Corridor-Permit.aspx
10. Compliance: The Department of Transport and Main Roads has been nominated by the
Chief Executive of the Department of State Development, Manufacturing, Infrastructure and
Planning as the entity responsible for the administration and enforcement of concurrence
agency conditions within Department of Transport and Main Roads’ area of interest.
The development must obtain a letter from Department of Transport and Main Roads
detailing satisfaction of compliance prior to the commencement of use and / or sealing of
survey plan. An application for compliance assessment can be made to Department of
Transport and Main Roads via [email protected] (please quote TMR19-
028418).
Department of State Development, Manufacturing, Infrastructure and Planning Page 11 of 15