6.        Bus route interference: The existing urban bus route 631 extending along Myall Street
          must be able to function during the construction of the development and any associated
          roadworks. Accordingly, if any temporary arrangements are required, the applicant must
          reach agreement on suitable arrangements with the Department of Transport and Mains’
          TransLink Division ([email protected]) prior to any construction or
          works commencing.
7.        Road works approval: Under section 33 of the Transport Infrastructure Act 1994, written
          approval is required from the Department of Transport and Main Roads to carry out road
          works on a state-controlled road. Please contact the Department of Transport and Main
          Roads’ on [email protected] to make an application for road works
          approval. This approval must be obtained prior to commencing any works on the state-
          controlled road reserve. The approval process may require the approval of engineering
          designs of the proposed works, certified by a Registered Professional Engineer of
          Queensland (RPEQ). Please contact the Department of Transport and Main Roads’ as soon
          as possible to ensure that gaining approval does not delay construction.
8.        Public utility works and connection approval: The applicant is advised that if any
          works and/or connections are required to public utility services within a State-controlled
          road reserve, approval must be given by the Department of Transport and Main Roads
          under the relevant public utility legislation (electricity, water/sewer, telecommunication),
          and in accordance with TMR technical standards (TN163). Approvals must be obtained
          prior to commencing any utility works within the state-controlled road reserve. Please
          contact the public utility team via [email protected] for further information on
          the application and approval process.
9.        Ancillary works and encroachments: In accordance with section 50(2) and schedule 6 of
          the Transport Infrastructure Act 1994 (TIA) and part 5 and schedule 1 of the Transport
          Infrastructure (State-Controlled Roads) Regulation 2006, written approval is required to
          carry out ancillary works and encroachments on a state-controlled road. These development
          conditions do not constitute such an approval. You will need to contact the Department of
          Transport and Main Roads on 5451 7055 or at [email protected] to make
          an application for a Road Corridor Permit under section 50(2) of the TIA to carry out
          ancillary works and encroachments. Ancillary works and encroachments include but are not
          limited to advertising signs or other advertising devices, paths or bikeways,
          buildings/shelters, vegetation clearing, landscaping and planting.

          Further information is available online at:
          www.tmr.qld.gov.au/Community-and-environment/Planning-and-development/Other-
          matters-requiring-approval/Road-Corridor-Permit.aspx
10.       Compliance: The Department of Transport and Main Roads has been nominated by the
          Chief Executive of the Department of State Development, Manufacturing, Infrastructure and
          Planning as the entity responsible for the administration and enforcement of concurrence
          agency conditions within Department of Transport and Main Roads’ area of interest.

          The development must obtain a letter from Department of Transport and Main Roads
          detailing satisfaction of compliance prior to the commencement of use and / or sealing of
          survey plan. An application for compliance assessment can be made to Department of
          Transport and Main Roads via [email protected] (please quote TMR19-
          028418).




Department of State Development, Manufacturing, Infrastructure and Planning                        Page 11 of 15
Log in to download the original file

1909-13367 SRA RA6-N Response with conditions.pdf · 440 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.