Skip to the record
For the highest quality transcripts.

Original source · versioned page text

1909-13367 SRA RA6-N Response with conditions

Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.

of 15

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                            1909-13367 SRA




11.       Noise Compliance: To ensure compliance with Condition 11, you should provide RPEQ
          certification with detailed noise barrier design for review and endorsement (prior to noise
          barrier construction) to ensure that the development has been designed and constructed in
          accordance with part (a) of the condition and the Department of Transport and Main Roads’
          Transport Noise Management Code of Practice and technical standards MRS15 and
          MRTS15.

          The review and endorsement of the noise barrier design, will ensure that the noise
          barrier complies with the requirements of conditions and the Department of Transport
          and Main Roads’ Road Traffic Noise Management Code of Practice and Technical
          Standards MRS15 and MRTS15.




Department of State Development, Manufacturing, Infrastructure and Planning                   Page 12 of 15
Log in to download the original file

1909-13367 SRA RA6-N Response with conditions.pdf · 440 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.